A photograph of Anton Tritt from the Buchan Group (right) leading an architecture tour at Re:START mall. The event was part of FESTA 2012.
University of Canterbury students attend a lecture in a tent while lecture theatres were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Lectures in progress in UC's tent village".
One of the tents set up in the Fine Arts car park at the University of Canterbury, used for teaching while lecture theatres were closed for structural testing. The photographer comments, "Temporary lecture tents".
Members of the University of Canterbury's E-Learning team Lei Zhang and Jess Hollis in their temporary office in the University Printery building. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Our end of the temporary office; Lei, my desk in the corner, Jess in the other corner (with a window to the admin/reception desk between us), Paul's desk right foreground. (He's home with a cold.)
Surveyors marking out Kirkwood Village, used as temporary teaching and office space for the University of Canterbury. The photographer comments, "Measuring up for the Kirkwood village".
Lei Zhang, a member of the University of Canterbury's E-Learning team, in their temporary office in the University Printery building. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. We are sharing an office at the printery building. Richard Holliday and Aimee Leaning do their pre-press and outsourcing work, while Lei configures a new video streaming system".
Okeover House, which was used to house the University of Canterbury's Senior Management Team after the Registry building was closed. The photographer comments, "SMT moved to Okeover".
University of Canterbury students outside one of the tents used while lecture theatres were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Students leave a lecture tent".
A sign at ground level on a coal bunker in the University of Canterbury's Facilities Management yard reads "Squawk. Quack quack squawk. Quack quack quack quack quack. Danger. Health and safety risk. No ducklings past this point." The photographer comments, "Sign on the coal bunker at the boiler house, FM".
University of Canterbury ICT staff members prepare to be escorted to buildings by Civil Defence members in order to retrieve computers from offices. The photographer comments, "ICT staff head out to retrieve computers from buildings".
Surveyors marking out Kirkwood Village, used as temporary teaching and office space for the University of Canterbury. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Surveyors mark out the temporary staff office buildings on the running track".
Students sit outside the InTentCity 6.3 Cafe, which was set up in a tent in the Law car park while University of Canterbury buildings were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3".
A member of the University of Canterbury's Civil Defence team escorts staff to retrieve essential items from their offices.
At a meeting in a tent, Vice-Chancellor Rod Carr speaks to staff about their return to work after the February 2011 earthquake. The photographer comments, "Staff briefing".
Students sit outside the InTentCity 6.3 Cafe, which was set up in a tent in the Law car park while University of Canterbury buildings were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. The cafe has an outside seating area under the trees".
Members of the University of Canterbury's Printery team in the Printery's reception area. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. We are sharing an office at the printery building. Looking from our office through to Printery reception".
Members of the University of Canterbury's E-Learning team in their temporary office space in the NZi3 building. The photographer comments, "E-Learning group meeting; Jess Hollis, Antoine Monti, Susan Tull, Alan Hoskin, Herbert Thomas, Nikki Saunders. Paul Nicholls at rear by window".
At a meeting in a tent, Vice-Chancellor Rod Carr speaks to staff about their return to work after the February 2011 earthquake. The photographer comments, "The VC addresses staff in a marquee in the Communication Disorders car park".
Members of the University of Canterbury's E-Learning team in their temporary office space in the NZi3 building. The photographer comments, "E-Learning group meeting; Jess Hollis, Antoine Monti, Susan Tull, Alan Hoskin, Herbert Thomas".
University of Canterbury staff members prepare to be escorted to their buildings by Civil Defence members in order to retrieve essential items from their offices.
University of Canterbury staff members prepare to be escorted to their buildings by Civil Defence members in order to retrieve essential items from their offices. The photographer comments, "Susan Tull (E-learning), Leigh Davidson (MBA administrator), Bob Reed (Economics)".
The InTentCity 6.3 Cafe, which was set up in a tent in the Law car park while University of Canterbury buildings were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. New cafe - InTentCity. (Get it...?)".
Cars parked on the lawn beside the NZi3 building. The photographer comments, "Lawns became parking spaces".
A crane beside the boiler chimney in the University of Canterbury's Facilities Management yard. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Inspection and repairs to the University's boiler system. It's getting cooler, we'll need heat soon - but we need accessible buildings first".
Okeover House, which was used to house the University of Canterbury's Senior Management Team after the Registry building was closed. The photographer comments, "SMT moved to Okeover".
A woman sits reading beside the "University of Canterbury" sign on Clyde Road. In the background are the tents used while lecture theatres were closed for structural testing. The photographer comments, "From Clyde Rd, all seemed intact".
A damaged wooden footbridge across the Avon River beside University Drive is blocked off with sheets of plywood and danger signs. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. The bridge to the Rec Centre".
A pathway through trees on the University of Canterbury campus, beside the Avon River. The photographer comments, "Path by the river, University Drive".
University of Canterbury students walk along University Drive to get to lectures, after most pathways through campus were cordoned off while buildings were structurally tested. The photographer comments, "Lawns beside University Drive became main walkways".
University of Canterbury students outside one of the tents used while lecture theatres were closed for structural testing. The photographer comments, "Students leave a lecture tent".