A digital copy of a plan for Crack'd for Christchurch's armchair artwork. The plan shows three views of an armchair from different angles.
A plan for Greening the Rubble's Green Room garden on Colombo Street. The plan was created by Jonathan Hall and Wendy Hoddinott from Greening the Rubble.
Photograph captioned by BeckerFraserPhotos, "Planning staff in conversation about the draft city plan".
A digital copy of a plan for the Greening the Rubble Green Room garden on Colombo Street. The plan shows a sketch of the garden including a raised floor, flower beds, a paved path, and a picket fence. It also contains measurements and notes on what will be planted in the beds.
A digital copy of a concept drawing of Crack'd for Christchurch's armchair artwork. The drawing is of an armchair from two different angles.
An artist's impression of the Greening the Rubble Green Room garden on Colombo Street. The image was created by Jonathan Hall and Wendy Hoddinott from Greening the Rubble.
A technical drawing of Crack'd for Christchurch's armchair artwork. The drawing includes height and width measurements for the back of the chair.
A digital copy of a concept drawing of Crack'd for Christchurch's armchair and ottoman artworks. The drawing is of an armchair and an ottoman. A written note near the bottom of the drawing reads, "Cast iron legs sources from Victorian bath tubs".
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be redeveloped".
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be re-developed".
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be redeveloped".
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be redeveloped".
Planning for the Pallet Pavilion on the Gap Filler headquarters whiteboard.
A photograph of community members giving feedback on the Sumner master plan.
A photograph of a speaker giving a presentation on the Sumner master plan.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Future Insurability. In an article in the New Zealand Herald of 5 November 2014, the CEO of IAG refers to cooperation with the NZ Government on a strategic intent in 2011 to avoid depopulation of Christchurch. Now that the ICNZ has signalled its intention to withdraw from high-risk areas and the CCC also plans to redefine the boundaries of the city so as to exclude properties below the Mean High Water Springs. We ask whether a 'recovery' involves abandoning people once the insurance and bank sectors have managed a retreat? We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable of its residents".
A photograph of community members at a meeting to discuss the Sumner master plan.
A photograph of community members at a meeting to discuss the Sumner master plan.
A photograph of community members at a meeting to discuss the Sumner master plan.
A photograph of a workstation in Crack'd for Christchurch's workshop. The workstation includes pieces of broken china, a pair of cutters for breaking up china, a plastic container to hold china pieces, and two mosaic plans. One of the plans has a piece of mesh laid over the top. The other is being used to lay out the mosaic.Crack'd for Christchurch comments, "Marie begins the very first flower. It is so difficult and time consuming that we are all in despair. Will this take forever? No-one is getting paid and we all have jobs and lives in some chaos thanks to the earthquakes."
A photograph of a sign giving information about consultation on the Avon Heathcote Estuary Ihutai Master Plan.
A photograph of a sign giving information about consultation on the Avon Heathcote Estuary Ihutai Master Plan.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Prime Minister Assurance. Let us remember the much-quoted assurance from the Prime Minister in 2011: 'On behalf of the Government, let me be clear that no one will be left to walk this journey alone. New Zealand will walk this journey with you. We will be there every step of the way. Christchurch; this is not your test; this is New Zealand's test. I promise we will meet this test.' We call on the authorities to live up to this promise. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable of its residents".
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Risk Acceptance. It is the role of insurance companies, the EQC included, to accept the risks covered under their terms of reference/policies and compensate policyholders when such risks eventuate. However, many policyholders in Christchurch have not been compensated for the damage to their homes and their lives. These responsibilities need to be faced by the entities responsible. An equitable solution needs to be found for properties with hazards such as flooding that are a direct result of the earthquakes. In tandem with this, every effort must be made to protect residents from the risks posed by climate change. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents".
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. 5. In your opinion, is there a better way to report on these recovery issues? Looking at the recovery from the perspective of the eastern suburbs, it is impossible to avoid thinking of phenomenon referred to as 'Disaster Capitalism' and considering the aspects that have already become evident in the recovery process. Loss of equity and quality of life, risk transfer and other substantial shifts are taking place. We suggest that a regular mini-census should be conducted through the remainder of the recovery at intervals of 6-12 months to monitor deprivation, insurance cover (or lack of it), mortgage, home equity, and rental status. If unexpected changes identified, investigation and correction measures should be implemented. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents ."
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. 5. In your opinion, is there a better way to report on these recovery issues? We believe that, as regards residential recovery, monitoring should extend to code compliance certificates. According to figures published in 2014, only factions of repairs/rebuilds are completed with the issue of a code compliance certificate. To conclude the work to the required standard, someone must pay for the code compliance. Leaving things as they are could have serious negative consequences for the recovery and for the city as a whole. We suggest an investigation of number of outstanding code compliance certificates and that responsible parties are made to address this outstanding work. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents."
A photograph of the former site of Westende Jewellers and Alva Rados, on the corner of Manchester Street and Worcester Street. The building was badly-damaged in the 4 September earthquake and was demolished soon afterwards. A two-storey building was built on the site and completed in July 2012. The building then had to be removed when the decision was made to widen Manchester Street as part of the draft transport plan for central Christchurch. The photograph was modelled after an image taken by Ian McGregor from Fairfax Media in September 2010.
A photograph of the former site of Westende Jewellers and Alva Rados, on the corner of Manchester Street and Worcester Street. The building was badly-damaged in the 4 September earthquake and was demolished soon afterwards. A two-storey building was built on the site and completed in July 2012. The building then had to be removed when the decision was made to widen Manchester Street as part of the draft transport plan for central Christchurch. The photograph was modelled after an image taken by Ian McGregor from Fairfax Media in September 2010.
NZ Army drivers planning a route for the delivery of chemical toilets. The toilets were delivered to residents in Christchurch who had been without water for ten days.