The earthquake re-pair work has started on the Knox Church on Bealey Avenue, August 14, 2013 Christchurch New Zealand.
While building after building is torn down in Christchurch, plans are in place to ensure as much of a 131-year-old church is retained as possible.
Knox Church on Bealey Avenue suffered major damage in the February 22 earthquak...
Christchurch "New Zealand" architecture building "Demolition of old Millers building" demolition detail rubbleDemolition started on the old Millers building on a walk around Christchurch May 6, 2013 New Zealand.
The building was originally designed in 1935 by G. A. Hart for the retail store, factory and warehouse Millers and was completed in 19...
The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Foyer lifts etc. Female toilets are off the foyer to the left. These lifts start at Level 2 of the Library, and are heavily used by students. (Once the building is repaired after the earthquake; several floors are still in a mess)".
Badly damaged in both the September and February quakes and over 6000 aftershocks the Point Pleasant yacht club had started to sink into the Avon estuary before being demolished in July 2011 after the June 6.3 earthquake