![](https://live.staticflickr.com/8112/8527914658_f57dcbf9bb_m.jpg)
Hopefully will be open again later this month - 25 months afer the February earthquake.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
At least two broken pieces from the Scott statue rest in the Canterbury Museum. The statue toppled in the 22nd February 2011 earthquake.
Prior to the earthquakes (mainly the February 22 2011 event) this park bench was at track level. Shortly after the February quake someone in the council did the sums and realised that the area near the Avon River had dropped between a metre and 1.4m (about 4 foot), so a rush job by contractors shifted in many tonnes of rock and gravel to raise a...
The damaged New Regent Street facades, seen from Gloucester Street through a cordon fence. The clock on New Regent Street stopped at 12.51 pm on 22 February 2011.
The damaged New Regent Street facades, seen from Gloucester Street through a cordon fence. The clock on New Regent Street stopped at 12.51 pm on 22 February 2011.
Shows a group of snails working on the rebuild of Christchurch. Refers to the slow pace of recovery after February 2011 earthquake in Canterbury. Quantity: 1 digital cartoon(s).
One model of the Temple for Christchurch with a rectangular base of Jarrah and solid silver conical shapes and wave like walls representing the movement of the 22 February 2011 earthquake. Based on the Temple for Christchurch sculpture that was designed by Hippathy Valentine.
A bus tours a city street with destroyed schools either side. The guide points out destruction on the right from earthquakes and on the left from Hekia Parata. Wider context is the ongoing impact of the Christchurch February 2011 earthquake. The implication is that the earthquake caused physical damage to some schools and that the Minister for Education is responsible for destroying others with her announcement of school closures in Christchurch on 18 February 2013. Quantity: 1 digital cartoon(s).
A house, one of the few still remaining in the Dallington Red Zone (Avonside Drive, Dallington). The area is "red zoned" due to land damage from earthquakes (mainly the February 22nd 2011 6.4 magnitude quake).
USAR codes and a yellow sticker can be seen on the doors of a damaged building. The yellow sticker was part of a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.
A photograph of Donna Allfrey's dog Niko, sitting on the front porch of her house on Oxford Terrace. The photographer comments, "Niko found Doug Sexton, Allfrey's neighbour, after the 22 February 2011 earthquake. Sexton had a heart attack during the earthquake and could not leave his damaged house".
Awaiting the demolition ball! See the hole punched in by the neighbouring building (now demolished) during the February 22 2011 earthquake. This building is leaning to the north (left) while it's now demolished neighbour was leaning to the south (right). All because the crap land gave way underneath!
Shows the Mainzeal logo fractured and with an earthquake red sticker, with the comment 'Land seems ok... Not sure about the structure!'. Refers to the announcement on 6 February that Mainzeal, one of New Zealand's largest construction companies actively involved in the Christchurch, rebuild had been placed in receivership. Quantity: 1 digital cartoon(s).
The old (or is that the new) Inland Revenue Department (IRD) building on the corner of Madras and Cashel Streets in central Christchurch. Built in 2006/07 on the site of the former Farmers department store (itself badly damaged by fire), it was just a few years old when the earthquake of February 2011 struck, and subsequent quakes (all through 2...
Shows a throng of sex workers rushing back following the announcement that 'Manchester Street's open!'. Prior to the Christchurch earthquake in February 2011 Manchester Street was the focus of street prostitution. On 13 April 2013 the Canterbury Earthquake Recovery Authority (CERA) announced: 'A temporary change to the cordon tonight sees Manchester Street open all the way through for the first time in over two years'. Quantity: 1 digital cartoon(s).
Roger Sutton, former chief executive of the the power lines company, Orion and since June 2011 Chief Executive Officer of the Canterbury Earhquake Recovery Authority, is shown in a straitjacket, raving. An unseen interviewer asks him how it feels after 'two years in the job'. Roger Sutton's work in leading the Earthquake Authority after the February earthquake was extremely stressful, considering the magnitude of the task. Quantity: 1 digital cartoon(s).
One framed certificate issued to SCIRT in 2013 to mark winning The Press Champion Canterbury Supreme Award in the Medium-Large Enterprise category.
One green koru shaped trophy issued to SCIRT in 2013 to mark winning The Press Champion Canterbury Supreme Award in the Medium-Large Enterprise category. Includes storage box, envelope and leaflet.
Two cardboard coffee cups in a takeaway tray sit on a wooden counter. The photographer comments, "What is the story of these coffees and that sad muffin? Were these an order when the earthquake struck Christchurch on 22 February 2011? Were these a workman's and a colleague's having a quick coffee break when a later aftershock caused them to leave everything behind when they fled the red zoned building, or were they just forgotten when the building was cleared out and abandoned?".
Shows a sick and damaged Christchurch Anglican Cathedral in a hospital bed with two attendants. The Cathedral asks 'Can ya just pull the plug and let me die peacefully?'. Context refers to recent comments by Bishop Victoria Matthews that the Christchurch Cathedral is 'being left to die with no dignity' because of ongoing legal battles about its future. There has been ongoing debate and controversy over whether the Cathedral should be demolished, reconstructed or restored following damage suffered in the February 2011 Earthquake. Quantity: 1 digital cartoon(s).