Water Tankers spraying the roads in Burwood to keep the sand and silt from entering the air and blowing around the neighbourhood.
A constructor working to complete the relay of a sewerage line in Burwood.
A police officer and soldier talk with a demolition contractor on Victoria Street. Tape has been placed across the street to create a temporary cordon.
People in hard hats and high visibility jackets at work on Montreal Street, in the rain.
A worker entering The Frame Workshop through a window on the second storey via a ladder. Fencing has been placed around the entrance to the building.
Workers dig trenches near the river in Kaiapoi.
Workers repairing water mains along Galbraith Avenue in Avonside. A blue pipe carrying a temporary water supply to the neighbourhood can be seen running across the park.
Contractors work to complete the relay of a sewerage line in Burwood.
Two workers in a cherry picker working on the Theatre Royal Building on Gloucester Street.
Two workers in a cherry picker working on the Theatre Royal Building on Gloucester Street.
The fixing of storm water drains on River Road in Avonside.
Contractors conferring near the Anzac Drive Bridge in New Brighton.
Contractors conferring near the Anzac Drive Bridge in New Brighton.
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
Contractors examining the underneath of the Anzac Drive Bridge in New Brighton.
Contractors examining the underneath of the Anzac Drive Bridge in New Brighton.
Contractors examining the underneath of the Anzac Drive Bridge in New Brighton.
A contractor taking a photograph from the Anzac Drive Bridge in New Brighton.
Photograph captioned by BeckerFraserPhotos, "Contractors' safety notice for the BDO building, Victoria Street".
Contractors examining cracks in the ground next to the Anzac Drive Bridge in New Brighton.
A photograph of contractor vehicles parked in Cathedral Square. In the background is the ANZ building.
Contractors adding steel pieces to the lamp posts of the Anzac Drive Bridge in New Brighton.
Contractors adding steel pieces to the lamp posts of the Anzac Drive Bridge in New Brighton.
Contractors adding steel pieces to the lamp posts of the Anzac Drive Bridge in New Brighton.
Contractors adding steel pieces to the lamp posts of the Anzac Drive Bridge in New Brighton.
Contractors adding steel pieces to the lamp posts of the Anzac Drive Bridge in New Brighton.
Workers digging up the road along Avonside Drive.
A photograph of contractor Tony Fisher of Fisher Agricultural Ltd. inspecting a dug out soil pit on a farm near River Road in Lincoln.
Three men digging silt out of storm water drains in Burwood.
A photograph of Peter Almond (wearing high visibility jacket), Derrick Moot and contractor Tony Fisher of Fisher Agricultural Ltd. inspecting a dug-out soil pit on a farm near River Road in Lincoln.