College of Engineering buildings reopen after the earthquakes.
Minister Stephen Joyce surveys the damage in the College of Engineering.
New ceiling installed in a lecture theatre in the College of Engineering.
New ceiling installed in a lecture theatre in the College of Engineering.
New ceiling installed in a lecture theatre in the College of Engineering.
New ceiling installed in the E8 lecture theatre in the College of Engineering.
New ceiling installed in the E8 lecture theatre in the College of Engineering.
New ceiling installed in the E8 lecture theatre in the College of Engineering.
New ceiling installed in the E8 lecture theatre in the College of Engineering.
College of Engineering staff stand beside a sign pointing through a fern garden to the temporary new entrance to the School of Engineering office. Asbestos is currently being removed from areas within the building. Pictured: Lisa Carter, Arran Yuill, Cecillia King, Karen Carthew, Janet Butcher, Cheryl McNickel and Vicki O'Sullivan.
College of Engineering staff stand beside a sign pointing through a fern garden to the temporary new entrance to the School of Engineering office. Asbestos is currently being removed from areas within the building. Pictured: Lisa Carter, Arran Yuill, Cecillia King, Karen Carthew, Janet Butcher, Cheryl McNickel and Vicki O'Sullivan.