Photograph captioned by BeckerFraserPhotos, "The Arts Centre, Hereford Street. Careful palleting of the pieces of the Arts Centre which fell to the ground".
A photograph captioned by BeckerFraserPhotos, "The Provincial Council Chambers on Durham Street. Materials from the building have been salvaged and placed on pallets outside".
Photograph captioned by BeckerFraserPhotos, "Salvaged material from the Cathedral ready for storage".
Barbara Garrie cuts cake while Jan Saville instructs Laura Dunham in the art of making tea in the pop-up tearoom at the opening of the Pallet Pavilion.
St Paul's church in Dallington, with many of the tiles removed from the roof, and pallets stacked in front. The photographer comments, "St Pauls Catholic Church, partially demolished".
St Paul's church in Dallington, with many of the tiles removed from the roof, and pallets stacked in front. The photographer comments, "St Pauls Catholic Church, partially demolished".
Pizza oven made out of recycled materials at the Gap Filler Pallet Pavilion. A sign on the oven reads "I'm still dryin'. I should be done by Jan 15".
An aerial photograph looking south over the Christchurch CBD centred on Colombo Street. The Town Hall and beginnings of Gap Filler's Pallet Pavilion can be seen to the bottom left.
A photograph submitted by Anonymous to the QuakeStories website. The description reads, "Chaos at work – that pallet of boxes was stacked on top pf the other one, got thrown completely clear; Feb 22nd.".
Masonry that has fallen from St John the Baptist Church in Latimer Square piled on a pallet in front of the church. Cracks can be seen in the building's foundations.
A snapshot from GPS Boomerang's SmartBird flight over the Christchurch red zone on 23 December 2012, looking over Durham Street with Gap Filler's Pallet Pavilion to the left, on the site of the Crowne Plaza Hotel.
A crane sitting beside the fence cordoning off the Cathedral of the Blessed Sacrament. In the foreground stones from the Christ Church Cathedral have been laid out on pallets.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Construction material has been laid up against the mural.
Hand-written signs on the fence opposite the Gap Filler Pallet Pavillion advertise events at the pavillion. One advertises a plant sale on Saturday 22 December, the other high teas and cakes on Sunday 23 December.
Fairway to heaven', number 70 in Gap Filler's Gap Golf course. This is the last hole in Gap Golf. It was built out of green felt, polystyrene, wooden pallets and rubber piping.
Photograph captioned by BeckerFraserPhotos, "Cathedral Square with the Cathedral in the foreground, the Novotel Hotel behind and BNZ building under deconstruction on the right".
The back of St John the Baptist Church on Hereford Street near Latimer Square. The tower has crumbled revealing the inner structure. The fallen bricks have been stacked on pallets, some still lying in the grass.
A snapshot from GPS Boomerang's SmartBird flight over the Christchurch red zone on 23 December 2012, looking over the Town Hall and Victoria Square with the site of the Crowne Plaza Hotel visible in the bottom left, GapFiller's Pallet Pavillion now in the space.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. A skip, several pallets, and other construction material have been placed in front of the mural.
A photograph of a Jonathan Hall transferring Crack'd for Christchurch's ottoman artwork onto a trailer.Crack'd for Christchurch comments, "Jonathan Hall getting Otto ready for his trip to meet Flora at their final destination."
A photograph of Helen Campbell and Jonathan Hall transfering Crack'd for Christchurch's ottoman artwork from Campbell's garage to a trailer.Crack'd for Christchurch comments, "Helen Campbell and Jonathan Hall getting Otto ready for his trip to meet Flora at their final destination."
The front wall of St John the Baptist Church in Latimer Square. Plywood and tarpaulins have been used to weather proof the gaps where masonry has fallen away from the building. Some of the fallen masonry is stacked on a pallet at the base of the building.
The front wall of St John the Baptist Church in Latimer Square. Plywood and tarpaulins have been used to weather proof the gaps where masonry has fallen away from the building. Some of the fallen masonry is stacked on a pallet at the base of the building.
A photograph of a mural on the side of Embassy on Colombo Street. The photographer believes that it was created by Yikes, Wongi "Freak" Wilson, and Ikarus. Several pallets of bricks have been stacked in front of the mural and a truck is parked to the right.
A photograph of Crack'd for Christchurch's armchair artwork being loaded on to the back of a truck. The armchair has been wrapped in a tarpaulin. Straps wound under the armchair are being lifted by a mechanical arm.Crack'd for Christchurch comments, "Flora is uplifted from the workshop at last!"
A photograph of the steel frame of Crack'd for Christchurch's armchair artwork. The frame is on a pallet in the Greening the Rubble workshop. Two cast-iron bath feet have been attached to the front legs.Crack'd for Christchurch comments, "Mid September 2013. The chair frame was made by Bob Hamilton from Total Fabrications."
A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have attached to the front legs.
A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.
A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.
A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.