A close up of the damaged stonework of Christ Church Cathedral. The upper part of the front wall has crumbled leaving the inside space exposed. Steel bracing has been placed against the wall to limit further damage.
The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.
A close up of the front of Christ Church Cathedral. The upper part of the front wall has crumbled leaving the inside space exposed. Steel bracing has been placed against the wall to limit further damage.
The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.
The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.
The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.
The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.
The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.
Damage to St John the Baptist Church in Latimer Square, where stone blocks have fallen and a steel bracing has been put in front to prevent any future damage. Photographed through the cordon fence.
The Empire Hotel on London Street in Lyttelton with heavy steel bracing holding up the facade. Bricks from the side wall have collapsed on to the footpath and wire fencing encloses the site.
A photograph of workers in a cherry picking installing steel bracing on the Colombo Street face of the former Sydenham Post Office. Wire fencing has been placed around the building as a cordon.
Photograph captioned by Fairfax, "Stephen Mateer (left) and James Gurnsey of the Lyttelton Coffee Company, who are thankful that they recently earthquake-strengthened their busy Lyttelton Cafe - see the steel beams behind them".
Damage to St John the Baptist Church in Latimer Square. Behind steel bracing, the gable end of the building has partly collapsed. The photographer comments, "The bracing did help hold the church up".
A photograph of workers in a cherry picking installing steel bracing on the Colombo Street face of the former Sydenham Post Office. A large crack can be seen in the side of the building.
A tent on Worcester Street set up for the soldiers stationed around the cordon. In the background, the damaged Our City O-Tautahi Building can be seen with steel bracing holding up the front.
The front of Christ Church Cathedral. The upper part of the front wall has crumbled leaving the inside space exposed. Steel bracing has been placed against the wall to limit further damage. The Citizens' Memorial statue stands to the left.
The front of Christ Church Cathedral. The upper part of the front wall has crumbled leaving the inside space exposed. Steel bracing has been placed against the front wall to limit further damage. The Citizens' Memorial statue stands to the left.
A security fence stands behind fallen rubble and the charred remains of the McKenzie & Willis building on High Street. A portable toilet has been placed on the road next to a steel beam which is supporting the building.
Photograph captioned by BeckerFraserPhotos, "The west wall of the Christ Church Cathedral where the rose window fell during the 23 December 2011 earthquake. Steel bracing has been used to hold up the front of the church".
A photograph captioned by BeckerFraserPhotos, "The base of a pillar on the site of the PGC building on Cambridge Terrace".
A photograph of the ChristChurch Cathedral showing the damage to the west wall and steel bracing. In the foreground is the plinth where a statue of John Robert Godley stood prior to the February 2011 earthquake.
The Octagon Live Restaurant (formerly Trinity Church) on Worcester Street. Steel bracing has been placed on the tower to limit further damage from aftershocks. Sculptures of a cyclist, bungee jumper, rock climber and kayaker can be seen on the bracing posts.
The wall of the Carlton Hotel has crumbled, exposing the interior of the upstair rooms. Scaffolding and steel bracing has been put up on the side, and a pile of building rubble can be seen on the footpath.
The wall of the Carlton Hotel has crumbled, exposing the interior of the upstair rooms. Scaffolding and steel bracing has been put up on the side, and a pile of building rubble can be seen on the footpath.
A digitally manipulated photograph of twisted reinforcing rods amongst the rubble from the demolition of QEII. The photographer comments, "These rarely seen worms live in the pressurised earth under the foundations of buildings. They need a damp soil and be under at least 100 pounds of pressure per square inch. After the destructive force of an earthquake they swiftly rise to the surface through gaps in the rubble. Unfortunately they quickly die and then crystallise as hard as iron in the dry low pressure air".
A photograph of the entrance to Gap Filler's temporary outdoor cinema on the corner of Madras and St Asaph Streets. The entranceway is made of lights on a steel frame, and leads to a painted "red carpet".
A photograph of the earthquake damage to Kenton Chambers on Hereford Street. Large cracks have formed between the windows, the brick crumbling onto the footpath below. Steel fences have been placed around the building as a cordon.
The front entrance of the Durham Street Methodist Church. The door is blocked by a safety fence and large concrete blocks, which have been used to secure the steel bracing supporting the front wall of the building.
A photograph of a badly-damaged shop on Colombo Street. The front wall of the top storey of the building has crumbled into the street, exposing the inside of the building. Steel and wooden bracing is keeping the ceiling up.
Sculptures of a kayaker, cyclist and bungee jumper decorating the steel bracing that has been placed on the front of the Worcester Street face of the Octagon Live Restaurant (formerly Trinity Church). Two of the figures are wearing santa hats.