Building construction in Edgeware. This will eventually house a SuperValue supermarket, on the fence is a large sign that says 'Kia Kaha Chch'.
Wood and bricks on Canterbury Street in Lyttelton. This construction material has been stripped from the house behind. To the right is a digger.
A photograph captioned by BeckerFraserPhotos, "Road works along Woodham Road in Linwood".
Photograph captioned by BeckerFraserPhotos, "University grounds, College House, and Bishop Julius hall of residence, with the new supermarket under construction at centre right".
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men add insulation to the back wall.
The public walking through and taking photographs of the ongoing deconstruction and construction work in the CBD. Two diggers can be seen in the background.
A historic sketch of the Manchester Courts, seen from the corner of Manchester and Hereford Streets, [1905].
The top story of Fuze Restaurant and Cafe is dismantled by construction workers. The building formerly housed the Harbour Board offices, and was built in 1880.
A temporary (5year) construction of giant cardboard tubes to be in use until the new or restored Christ Church Cathedral is back in the Square
A photograph captioned by BeckerFraserPhotos, "Roadworks on the intersection of Gloucester Street and Woodham Road".
A photograph captioned by BeckerFraserPhotos, "Roadworks on the intersection of Gloucester Street and Woodham Road".
Photograph captioned by BeckerFraserPhotos, "The construction of this window frame at Cranmer Court is clearly seen when the exterior stone has collapsed in the earthquake".
A photograph of the entrance to Ballantynes on Cashel Street. A sign by the door that states the building is a construction site and a multiple hazards area.
A photograph captioned by BeckerFraserPhotos, "The T Bakery on Woodham Road, one of the first rebuild projects".
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer measures a spot on the roof for the solar panels.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer drills a hole in the roof for the solar panels.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers are kept busy moving scaffolding and fixtures".
A hydraulically powered claw, or grapple, to attach to a digger or excavator. The orange painted iron claw has two opposing levers to pinch materials for demolition or construction.
The C.F. Cotter & Co building on High Street. Security fencing has been placed around the building to restrict access. Weeds are growing on the vacant construction lot next to the building.
A photograph of a large frame being constructed in a car park in Re:START mall for Canterbury Tales. Canterbury Tales was the main event of FESTA 2013.
A photograph of a large frame being constructed in a car park in Re:START mall for Canterbury Tales. Canterbury Tales was the main event of FESTA 2013.
A photograph of a large cardboard platform wrapped in blue plastic and ropes, lying near the Avon River on Cambridge Terrace. The platform is part of Canterbury Tales, which was the main event of FESTA 2013.
Construction workers with high visibility clothing and hard hats assemble a crane on High Street to help demolish the Westpac Building. The BNZ building can be seen in the background.
A digitally manipulated image of demolition machinery, with the Hotel So in the background. The photographer comments, "Strange things happen when you use technicolor film".
Kilmore Street, looking west from Manchester Street. The street has been barred off by wire fencing. A pile of steel, construction equipment and a portaloo sit in front of the cordon.
A photograph of the new Press Building on Gloucester Street under construction. To the right, the former Theatre Royal can be seen with wooden beams placed under the awning for support.
Demolition along Kilmore Street. A digger can be seen as well as a construction worker with a high hat and high-visibility vest. The rubble has been separated into different piles.
Fencing in Poplar Lane cuts one side off from the other, but a City Council sign reads "Businesses open as usual during construction", indicating the stores and bars are still open.
A photograph looking west down Tuam Street. C1 Espresso can be seen on the right. On the left, construction hoarding and scaffolding surrounds the badly-damaged McKenzie & Willis building.
Quin Henderson, South Island Manager, Hawkins Construction, part of the McConnell Group of companies, has donated $100,000 to the UC Business Partnerships Campaign for a three-year PhD scholarship in Engineering.