A photograph of a member of the Wellington Emergency Management Office Emergency Response Team standing on the bank of the Avon River. In the background are the remains of the collapsed PGC Building. An excavator is on top of these remains, working to clear them away.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team pointing to an earthquake-damaged house in central Christchurch. A large section of the house has collapsed, the rubble spilling onto the driveway. Emergency tape has been draped across the driveway as a cordon.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team walking through the intersection of Manchester and Gloucester Streets. In the background, Manchester Street has been cordoned off with wire fences and is littered with rubble. Many of the buildings in view are severely damaged.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team inside an office. In the foreground, the drawers of filing cabinets have opened. Files and posters litter the ground. The coverings over the lights have shaken loose, and one is hanging just behind the ERT member.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team sitting against a fence on Worcester Street near Latimer Square.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team team on the footpath of Worcester Street near Latimer Square.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team inspecting the Southern Finance Ltd building on Montreal Street.
The Taiwanese Search and Rescue team at the Christchurch International Airport after helping out with the emergency response to the Canterbury Earthquake.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
Personnel from the USAID Disaster Assistance Response Team (DART) photographed in front of the collapsed Smiths City car park on Dundas Street.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team standing in front of an earthquake-damaged building on Lichfield Street. A section of the roof and the façade on the top storey of the building have collapsed and the bricks and other rubble have spilled onto the footpath and street below. USAR codes have been spray-painted on one of the bottom-storey windows and the front door.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team climbing a ladder up the back of a house on Gloucester Street. The ladder has been placed against the house so that the ERT members can enter the building through the open window. To the right a section of the house next door has collapsed and the bricks have spilled onto the shed below.
Al Dwyer, leader of the USAID Disaster Assistance Response Team (DART), outside the US headquarters in Latimer Square. Members of DART can be seen behind him. Latimer Square was set up as a temporary headquarters for emergency management personnel after the 22 February 2011 earthquake.
Prime Minister John Key talking to Al Dwyer, the leader of the Disaster Assistance Response Team (DART), outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.
Prime Minister John Key preparing for a photograph with Al Dwyer, the leader of the USAID Disaster Assistance Response Team (DART), and members of DART, outside the US headquarters in Latimer Square. Latimer Square was set up as a temporary headquarters for emergency managements personnel after the 22 February 2011 earthquake.
Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining an earthquake-damaged building on Acton Street. The closest section of the outer wall has collapsed, and the bricks and other rubble have fallen onto the pavement in front. A boat which was being stored inside has toppled over and is now sticking out of the building.
Deputy Administrator for Protection and National Preparedness at the Federal Emergency Management Agency, Tim Manning, briefing members of the Disaster Assistance Response Team (DART) upon their arrival in Christchurch to assist with search and rescue efforts.
Deputy Administrator for Protection and National Preparedness at the Federal Emergency Management Agency, Tim Manning, briefing members of the Disaster Assistance Response Team (DART) upon their arrival in Christchurch to assist with search and rescue efforts.
Prime Minister John Key talking to Al Dwyer, the leader of the Disaster Assistance Response Team (DART), outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining an earthquake-damaged building on Acton Street. The closest section of the outer wall has collapsed, and the bricks and other rubble have fallen onto the pavement in front. A boat which was being stored inside has toppled over and is now sticking out of the building.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team working on the corner of Tuam and High Streets. In the background a large section of a building has collapsed and the bricks and other rubble have spilled onto the road. Wire fencing has been placed around the building as a cordon.
A photograph of members of the Clandeboye Emergency Response Team and the Red Cross working on High Street near the intersection of Manchester Street. A digger is parked on the street in front of the workers. Behind the digger is a large pile of rubble from the ANZ Bank building.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining an earthquake-damaged building on Acton Street. The closest section of the outer wall has collapsed, and the bricks and other rubble have fallen onto the pavement in front. A boat which was being stored inside has toppled over and is now sticking out of the building.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team examining an earthquake-damaged building on Acton Street. The closest section of the outer wall has collapsed, and the bricks and other rubble have fallen onto the pavement in front. A boat which was being stored inside has toppled over and is now sticking out of the building.
A photograph of a map used by the Wellington Emergency Management Office Emergency Response Team. The block of buildings between Montreal, Acton, St Asaph, and Antigua Streets has been outlined in red. Halkett Street has also been coloured in red. Various buildings around these areas have been highlighted in orange and blue.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Latimer Square. To the right, shipping containers have been stacked beside the square. A cordon of wire fences and road cones have also been used to cordon off the street in the distance.
A photograph of a map used by the Wellington Emergency Management Office Emergency Response Team. The block of buildings between Montreal, Acton, St Asaph, and Antigua Streets has been outlined in red. Halkett Street has also been coloured in red. Various buildings around these areas have been highlighted in orange and blue.
A photograph of the earthquake damage to the Edward Gibbon building on Madras Street. Sections of the top storey have collapsed and the bricks have spilled onto the road in front, damaging the awning and smashing several cars. In the foreground members of the Wellington Emergency Management Office Emergency Response Team are standing on the road.
Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.