A photograph captioned by BeckerFraserPhotos, "First floor of a collapsed building at 143 Manchester Street".
Sticky Fingers Restaurant & Bar, on the ground floor of the Clarendon Tower, seen from across from the Avon river.
A photograph of a crack in the floor of an earthquake-damaged building at the University of Canterbury.
Insulation waiting to be installed into the floor of one of the temporary classrooms in the Ilam Oval.
Pieces of decorative stonework that have been arranged on the floor of the Durham Street Methodist Church.
A volunteer painting a sheet of wood for the dance floor of Gap Filler's "Dance-O-Mat".
A volunteer painting a sheet of wood for the dance floor of Gap Filler's "Dance-O-Mat".
A volunteer painting a sheet of wood for the dance floor of Gap Filler's "Dance-O-Mat".
A volunteer painting a sheet of wood for the dance floor of Gap Filler's "Dance-O-Mat".
(It was already opened up mid-way through a repair. But it wasn't on the floor!)
A worker inserts glue between the insulation panels in the floor of one of the temporary buildings on the Ilam Oval.
Piles in the ground, waiting for the floors of temporary classrooms to be built on top, on the Ilam Oval.
The multi-storey Pacific Brands building on Victoria Street has been cordoned off. The Cranfield shop occupied the first floor.
A staff member takinga photograph of grains and beans fallen from bags onto the floor of Piko Wholefoods.
The Copy Centre operating out of a space at the ground floor of the UCSA building, adjacent to the food court.
A photograph captioned by BeckerFraserPhotos, "5 Poplar Street with damage from 23 December 2011 on the second floor".
A computer tipped over and files fallen on the floor in the English department office after the 23 December 2011 earthquake.
The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Foyer lifts etc. Female toilets are off the foyer to the left. These lifts start at Level 2 of the Library, and are heavily used by students. (Once the building is repaired after the earthquake; several floors are still in a mess)".
Photograph captioned by BeckerFraserPhotos, "Press Building, Cathedral Square. Top floor collapsed during the February 22 earthquake".
A photograph captioned by BeckerFraserPhotos, "The dramatically sloping floor of the Hotel Grand Chancellor car park".
Photograph captioned by BeckerFraserPhotos, "Press Building, Cathedral Square. Top floor collapsed during the February 22 earthquake".
A photograph of a crack in the floor of the Diabetes Centre. The crack has been filled in.
Photograph captioned by BeckerFraserPhotos, "Central Library with the books now cleared off the floor in this part".
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
Photograph captioned by BeckerFraserPhotos, "Books on the floor of the Sumner Library, seen through the front window".
Photograph captioned by BeckerFraserPhotos, "Books on the floor of the Sumner Library, seen through the front window".