An aerial photograph of the Canterbury Provincial Chambers Building on Durham Street.
The inside of a tent set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
Hard hats, hi-vis, and a first aid kit, waiting outside as Emergency and Security staff retrieve work for the Registry Building.
Various CER staff enter the Registry to retrieve equipment and work. The web, design, and information teams support with emergency and security staff.
Pick up/drop off sign for a shuttle bus stop on campus, taking students from the Ilam Campus to Dovedale for their classes.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
Cement is piped from the trucks to the foundations where it is poured into the foundation posts when building the Ilam village.
One of the random acts of kindness on campus, a BBQ is being put on for students and staff on Arts Road.
One of the random acts of kindness on campus, a BBQ is being put on for students and staff on Arts Road.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
UC student trainee science teacher Carrie Whyte helps out at a Papanui study centre, assisting Bopha Chea with her Art History assignment.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
Emergency and security staff members prepare to enter the 6th floor of the Registry building to retrieve work from the offices there.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
Launch function for the UC CEISMIC digital archive. Associate Professor and UC CEISMIC Director Paul Millar and Associate Director Dr James Smithies.
Cement is piped from the trucks to the foundations where it is poured into the foundation posts when building the Ilam village.