Wednesday 2 May 2012. File reference: CCL-2012-05-02IMG_2220 From the collection of Christchurch City Libraries.
23 May 2012. File reference: CCL-2012-05-23-IMG_2881 From the collection of Christchurch City Libraries.
28 February 2012. File reference: CCL-2012-01-28-AroundChristchurch-IMG_0016 From the collection of Christchurch City Libraries.
The cartoon shows the Christchurch Cathedral surrounded by rubble and with its steeple gone. The bell lies on the ground and pieces of broken stone form the word 'tragedy'. Context - The Christchurch earthquake 22 February 2011. Quantity: 1 digital cartoon(s).
Santa Claus drives his sleigh at great speed towards Christchurch shouting 'Hang on Christchurch we're on our way!' Context: concern about continuing trials and tribulations of Christchurch with continuing earthquakes and aftershocks. Colour and black and white versions available Quantity: 2 digital cartoon(s).
A photograph of a media briefing on the Christchurch earthquake response. The briefing was held in the in the Christchurch Art Gallery, which served as the temporary Civil Defence headquarters after the 22 February 2011 earthquake. Mayor Bob Parker is about to speak.
One felted purple 'Heart for Christchurch' decorated with a pink rose with green leaves and an orange loop at the top centre so the item can be displayed. Faint stitched inscription 'we are / with you' on reverse. Made for the people of Christchurch following the 22 February earthquake. Jill Gunn contributed this ‘Heart for Christchurch’ as a g...
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. 5. In your opinion, is there a better way to report on these recovery issues? Looking at the recovery from the perspective of the eastern suburbs, it is impossible to avoid thinking of phenomenon referred to as 'Disaster Capitalism' and considering the aspects that have already become evident in the recovery process. Loss of equity and quality of life, risk transfer and other substantial shifts are taking place. We suggest that a regular mini-census should be conducted through the remainder of the recovery at intervals of 6-12 months to monitor deprivation, insurance cover (or lack of it), mortgage, home equity, and rental status. If unexpected changes identified, investigation and correction measures should be implemented. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents ."
A colour photograph of details on the north side of the Lyttelton Times Building on Gloucester Street, taken after the 4 September 2010 earthquake.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Future Insurability. In an article in the New Zealand Herald of 5 November 2014, the CEO of IAG refers to cooperation with the NZ Government on a strategic intent in 2011 to avoid depopulation of Christchurch. Now that the ICNZ has signalled its intention to withdraw from high-risk areas and the CCC also plans to redefine the boundaries of the city so as to exclude properties below the Mean High Water Springs. We ask whether a 'recovery' involves abandoning people once the insurance and bank sectors have managed a retreat? We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable of its residents".
A colour photograph of the north face of the Anderson's Building, viewed from Cashel Street taken before the earthquakes.
A colour photograph of the north side of the Lyttelton Times Building on Gloucester Street, taken after the 4 September 2010 earthquake.
Damage to retail buildings on High Street. Shops shown include Burgers & Beers, as well as boutique clothing stores Embassy and Plush. All are cordoned off for safety. A collapsed ceiling is visible through the windows above Burgers & Beers.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. 5. In your opinion, is there a better way to report on these recovery issues? We believe that, as regards residential recovery, monitoring should extend to code compliance certificates. According to figures published in 2014, only factions of repairs/rebuilds are completed with the issue of a code compliance certificate. To conclude the work to the required standard, someone must pay for the code compliance. Leaving things as they are could have serious negative consequences for the recovery and for the city as a whole. We suggest an investigation of number of outstanding code compliance certificates and that responsible parties are made to address this outstanding work. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents."
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Risk Acceptance. It is the role of insurance companies, the EQC included, to accept the risks covered under their terms of reference/policies and compensate policyholders when such risks eventuate. However, many policyholders in Christchurch have not been compensated for the damage to their homes and their lives. These responsibilities need to be faced by the entities responsible. An equitable solution needs to be found for properties with hazards such as flooding that are a direct result of the earthquakes. In tandem with this, every effort must be made to protect residents from the risks posed by climate change. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents".
A colour photograph of the west facade of the Excelsior Hotel, taken after the September 4th earthquake.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Prime Minister Assurance. Let us remember the much-quoted assurance from the Prime Minister in 2011: 'On behalf of the Government, let me be clear that no one will be left to walk this journey alone. New Zealand will walk this journey with you. We will be there every step of the way. Christchurch; this is not your test; this is New Zealand's test. I promise we will meet this test.' We call on the authorities to live up to this promise. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable of its residents".
A colour photograph of the north side of the Excelsior Hotel, taken from High Street.
A photograph of window details on the Excelsior Hotel, taken after the 4 September 2010 earthquake.
A colour photograph of the Fisher's Building, seen from the corner of Lichfield and High Streets. The photograph was taken before the 4 September 2010 earthquake.
The Stewart Dawson building on the corner of High and Cashel Streets, in 2009 before the earthquakes.
Colour photograph of cracking in the structure of St. Elmo's Courts following the 4 September 2010 earthquake.
Colour photograph of St. Elmo's Courts, taken from the corner of Hereford and Montreal Streets before the earthquakes.
A colour photograph of the north facade of the former Odeon Theatre after the 4 September 2010 earthquake.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
