Photograph captioned by BeckerFraserPhotos, "The Novotel Hotel viewed from Gloucester Street. Scaffolding has been constructed up the side".
A photograph of volunteers constructing the Info Gap temporary outdoor display space on the corner of Peterborough and Colombo Streets.
Scaffolding inside the Durham Street Methodist Church that has been constructed to allow workers to remove the church's historic and valuable organ.
Three men photographed on a slab of concrete at the partially constructed Pallet Pavilion. Chains from a crane are hanging above.
Damage to a building on Colombo Street. Scaffolding has been constructed against the wall and it has blue and yellow tarp to protect it from the rain.
A photograph of the Diabetes Centre on Hagley Avenue, taken from the car park. Scaffolding has been constructed up the sides of the building.
A photograph of part of a sculpture being constructed for the Pavilions & Lighting Devices night market, which is part of LUXCITY.
A volunteer on top of one of the Pallet Pavilion walls during construction. Scaffolding has been constructed around the wall out of wood.
A volunteer on top of one of the Pallet Pavilion walls during construction. Scaffolding has been constructed around the wall out of wood.
Damage to a building on Colombo Street. Scaffolding has been constructed across the front and it has a blue and yellow tarp to protect it from the rain.
A close-up photograph of Kloud at LUXCITY. The installation is constructed out of sheer fabric and held up by a crane.
Scaffolding inside the Durham Street Methodist Church that has been constructed to allow workers to remove the church's historic and valuable organ.
A view down New Regent Street. Several of the buildings have had their verandahs propped with steel poles, and scaffolding has been constructed on their facades.
A partly constructed tilt slab building on the demolition site of 338 Montreal Street. In the background, a severely damaged B&B can be seen.
A partly constructed tilt slab building on the demolition site of 338 Montreal Street. In the background, a severely damaged B&B can be seen.
Director of Gap Filler, Coralie Winn, photographed next to a stack of pallets. These are to be painted and constructed into the Pallet Pavilion.
The cleared building site on St Asaph Street where Gap Filler's Playtime project will be constructed, a temporary cinema called 'The Night Club'.
A photograph of Argosy House on Victoria Street with concrete blocks stacked in front. Scaffolding has been constructed on the footpath in front.
The upper section of the Durham Street Methodist Church. Scaffolding has been constructed to allow workers to retrieve the church's valuable and historic organ.
Photograph captioned by BeckerFraserPhotos, "Clarendon Hotel, 78 Worcester Street. The original hotel facade (1902) has been retained when the new hotel was constructed behind".
A volunteer constructs benches out of recycled material from demolished building. These benches will serve as seats for Gap Filler's temporary cinema, 'The Night Club'.
The damaged Knox Church on Bealey Avenue. Bricks have fallen from the walls, exposing the wooden beams. The photographer comments, "You can now see how the old churches were constructed".
The upper section of the Durham Street Methodist Church. Scaffolding has been constructed to allow workers from the South Island Organ Company to retrieve the church's valuable historic organ.
A photograph looking north-east along Williams Street in Kaiapoi. Scaffolding has been constructed up the sides of the buildings on both corners of Charles Street.
An aerial photograph looking south west over the CBD. Latimer Square can be seen in the centre right of the photograph. To the left, the Transitional Cathedral is being constructed.
A view down New Regent Street. Several of the buildings have had their verandahs propped with steel poles, and scaffolding has been constructed on the facade of one of the buildings.
The Cranmer Centre on Armagh Street. A large part of the east facade has collapsed, revealing the building's interior. Scaffolding has been constructed on the side of the building.
The pulpit of the Durham Street Methodist Church. The scaffolding around it has been constructed to allow workers to remove the church's historic and valuable organ.
Volunteers help Gap Filler clear a vacant building site of weeds. This is where Gap Filler's Playtime project will be constructed, a temporary cinema called 'The Night Club'.
Volunteers help Gap Filler clear a vacant building site of weeds. This is where Gap Filler's Playtime project will be constructed, a temporary cinema called 'The Night Club'.