A thank you note to Resene on the "Instant Poetry" wall. Resene donated paint for the mural.
Gap Filler and Poetica's "Instant Poetry" wall on Colombo Street. One of Shakespeare's sonnets has been painted on the mural as well as a blackboard. Members of the public are encouraged to add their poems to the blackboard.
A poetry reading at Poetica and Gap Filler's "Instant Poetry" installation on Colombo Street.
A poetry reading at Poetica and Gap Filler's "Instant Poetry" installation on Colombo Street.
The exposed wall of a building on Peterborough Street with an almost-finished mural. This was a joint project between Gap Filler and the Flying Cup Cafe.
A volunteer in a hard hat and high-visibility vest, holding tools in both hands.
Volunteers potting plants. These will be planted in the pallets of the Pallet Pavilion.
The partially constructed Pallet Pavilion on the site of the demolished Crowne Plaza Hotel. Concrete slabs have been laid on the ground and a stack of painted pallets can be seen in the background.
Volunteers in hard hats and high-visibility vests helping to build the Pallet Pavilion.
Volunteers drilling holes in pallets during the construction of the Pallet Pavilion.
Two men and a crane laying slabs of concrete on the site of the Pallet Pavilion. These will serve as a floor for the structure.
Two men and a crane laying slabs of concrete on the site of the Pallet Pavilion. These will serve as a floor for the structure.
The site of the demolished Crowne Plaza Hotel on the corner of Durham and Kilmore Streets. The construction of the Pallet Pavilion is underway.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Pallets being stacked to form the walls of the Pallet Pavillion. Steel rods have been put in place to join the pallets together.
A member of Gap Filler with a hard hat and high-visibility vest, holding a tool to fill gaps in the Pallet Pavilion.
Volunteers standing on top of pallets during the construction of the Pallet Pavilion.
Pallets being stacked to form the walls of the Pallet Pavillion. Steel rods have been put in place to join the pallets together.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
A partially constructed wall of the Pallet Pavilion, beginning to take shape.
A volunteer in a hard hat and high-visibility vest, potting plants for the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, potting plants for the Pallet Pavilion.
Two volunteers in hard hats and high-visibility vests drilling holes in a pallet.
Two volunteers in hard hats and high-visibility vests drilling holes in a pallet.
Volunteers in hard hats and high-visibility vests, potting plants for the Pallet Pavilion.
A colander for the Pallet Pavilion, drawn on a whiteboard in the Gap Filler office.
Volunteers building a Pallet Pavilion wall by stacking pallets.
Coralie Winn, director of Gap Filler, meeting Camilla, the Duchess of Cornwall, on Gap Filler's "Dance-O-Mat".
A group of people dancing on Gap Filler's "Dance-O-Mat".
A volunteer painting sheets of wood for the dance floor of Gap Filler's "Dance-O-Mat".