AMI Stadium (Lancaster Park), not used since the February 2011 earthquake.
It was used predominantly for rugby and cricket.
We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.
The concrete pad lower left is ...
With the land dropping about 1metre to 1.4metres after the earthquakes, a few roads besides the Avon and Heathcote Rivers are flooded with very high tides. Extra stop banks (on right) erected after the quakes have helped, but the road is now well below high water level.
New Brighton Road, just short of New Brighton. The Pages Road bridge may b...
The Cranmer Court demolition started today in Christchurch. The 1876 building was originally a Normal School and was in a derelict state in the early 1980s when it was rescued and converted into apartments. The heritage-listed building was red-stickered after the February 2011 earthquake.
The South New Brighton jetty has been closed for 3 or 4 years (fenced off) then the fence was removed and it was "open", but nothing has happened to it since the earthquakes, but it is closed again now, although it looks like a home made sign!
Another city walk around, this time with my brother-in-law from Auckland. Also went to the Quake City exhibition in the city organised by the Canterbury Museum. First fine day for a while.
Another city walk around, this time with my brother-in-law from Auckland. Also went to the Quake City exhibition in the city organised by the Canterbury Museum. First fine day for a while.
Another city walk around, this time with my brother-in-law from Auckland. Also went to the Quake City exhibition in the city organised by the Canterbury Museum. First fine day for a while.
Another salvaged house from the Bexley (Pacific Park) red zone is on the truck and may start it's journey to a new location overnight.
19 Velsheda Street, Pacific Park, Bexley is about to be trucked out.
Awaiting the demolition ball! See the hole punched in by the neighbouring building (now demolished) during the February 22 2011 earthquake. This building is leaning to the north (left) while it's now demolished neighbour was leaning to the south (right).
All because the crap land gave way underneath!
Today was the first time I have been to the earthquake memorial since it was completed and opened on 22nd February 2017, six years after the devastating quake that killed the 185 that are named on this wall.
I knew two of the people on the list.
Only it is worse this time! As from Wednesday I won't have car access to the property, nor the street, nor one of the neighbouring streets - for a month at least! A second attempt to do a sewer repair after the earthquakes - yes I know they were 3 to 2½ years ago!
Another house has gone from Seabreeze Close, Pacific Park, Bexley, leaving just the concrete base, a few floor tiles and the smashed toilet (throne).
Houses are being demolished (85%) or deconstructed/shifted (15%) as a result of land damage in the major earthquakes of 4th September 2010, 22nd February 2011, 13th June 2011 and 23rd December 2...
Demolition of the relatively new seven-storey Waters Edge Apartments in Ferrymead continues. CERES Environmental NZ are doing the job for CERA (Canterbury Earthquake Recovery Authority).
Some will be pleased to see this block go as there was lot of resentment to it being built on the site of the old Ferrymead Tavern,
Selected for Explore, #347...
The ticket office at Lancaster Park (AMI Stadium), not used since the February 2011 earthquake. Windows broken and door boarded up.
We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.
Edgeware Supervalue Supermarket being demolished after the 6.3 magnitude quake hit Christchurch 22 February 2011.
♥An attempt to capture the movement of the wall coming down with 3 exposure and HDR processing.
Hotel Grand Chancellor on verge of collapse but still standing after the 6.3 magnitude quake hit Christchurch on 22 February 2011 because of concrete being poured into the lower floors.
Broken head-stones as a result of the magnitude 6.3 quake in Christchurch - 22 February 2011. HDR process to add the "feeling" I felt at seeing this sort of damage.
Earthquake damaged building on a Walk around the city, May 1, 2014 Christchurch New Zealand.
Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department store.
It featured the South Island's first escalator, which...
None
Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage.
Another city walk around, this time with my brother-in-law from Auckland. Also went to the Quake City exhibition in the city organised by the Canterbury Museum. First fine day for a while.
None
None
Two relatively new town houses in the Bexley "Red Zone". Awaiting demolition due to severe land problems. Have been vandalised.
My house (bought in March 2004) till the government procured it in October 2012, is finally being demolished. It will be an empty section in a couple of days, once they rip up the concrete base.
Note the rainbow on right.
20130817_2457_1D3-400 The story of Christchurch (Day 229/365)
Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...
The old (or is that the new) Inland Revenue Department (IRD) building on the corner of Madras and Cashel Streets in central Christchurch. Built in 2006/07 on the site of the former Farmers department store (itself badly damaged by fire), it was just a few years old when the earthquake of February 2011 struck, and subsequent quakes (all through 2...
20160419_7732_7D2-400 The City is in Rebuild phase (110/366)
A totally different view to a few years ago. Most of the tall buildings have gone and construction is underway on a lot of new buildings, View from across the Estuary in Redcliffs.
A couple of days ago the government agency controlling the post-earthquake work (CERA - Canterbury Ea...
A couple of city blocks away from the now damaged Cathedral a temporary $4million cathedral has been built using large cardboard tubes and sheeting.