The damaged Cathedral of the Blessed Sacrament, seen from the north side. Large cracks are visible below the dome.
Central city cordon on the corner of Durham Street North and Bealey Avenue, with both Army and Police presence.
Removal of the earthquake damaged footbridge over the Avon at Medway Street.
Tuesday 12 February 2013.
File reference: CCL-2013 -02-12-untitled6.bmp
From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street.
Tuesday 12 February 2013. File reference: CCL-2013 -02-12-untitled7.bmp
From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street.
Tuesday 12 February 2013. File reference: CCL-2013 -02-12-untitled8.bmp
From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street.
Tuesday 12 February 2013.
File reference: CCL-2013 -02-12-untitled3.bmp
From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street.
Tuesday 12 February 2013.
File reference: CCL-2013 -02-12-untitled.bmp
From the collection of Christchurch City Libraries.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Removal of the earthquake damaged footbridge over the Avon at Medway Street.
Tuesday 12 February 2013.
File reference: CCL-2013 -02-12-untitled2.bmp
From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street.
Tuesday 12 February 2013.
File reference: CCL-2013 -02-12-untitled5.bmp
From the collection of Christchurch City Libraries.
Removal of the earthquake damaged footbridge over the Avon at Medway Street.
Tuesday 12 February 2013.
File reference: CCL-2013 -02-12-untitled4.bmp
From the collection of Christchurch City Libraries.
A few older Christchurch Earthquake Pics from after the 6.3 last Feb (2011).
And yes the aftershocks are still happening..
Twitter | Facebook |
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
Aftermath of September 4th Earthquake in Canterbury, NZ. Damage to store - corner of Gloucester and Woodham Road, Christchurch.
Earthquake damage. As a result of the September 2010 earthquake, with further damage from the February 2011 event.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
Eastgate Mall - The Warehouse (03.03.2011)
Linwood
Christchurch
Canterbury
New Zealand
© 2011 Phil Le Cren
Photo Taken With:
Canon EOS 1000D
+ Canon EF/EF-S lenses
+ 10.1 effective megapixels
+ 2.5-inch TFT color LCD monitor
+ Eye-level pentamirror SLR
+ Live View shooting.
+ EOS Built-in Sensor cleaning system
+ Wi...
Typical lateral damage to houses caused by the 7.1 magnitude quake in Christchurch at 4.35am on the 4th September 2010.
Eastgate Mall - The Warehouse (03.03.2011)
Linwood
Christchurch
Canterbury
New Zealand
© 2011 Phil Le Cren
Photo Taken With:
Canon EOS 1000D
+ Canon EF/EF-S lenses
+ 10.1 effective megapixels
+ 2.5-inch TFT color LCD monitor
+ Eye-level pentamirror SLR
+ Live View shooting.
+ EOS Built-in Sensor cleaning system
+ Wi...
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
Christchurch Earthquake Aftermath
PWS-2010-09-12-DSC02226
Christchurch Earthquake Aftermath
PWS-2010-09-12-DSC02233
Christchurch Earthquake Aftermath
PWS-2010-09-12-DSC02232
None
Christchurch Earthquake Aftermath
PWS-2010-09-12-DSC02231
Christchurch Earthquake Aftermath
PWS-2010-09-12-DSC02237