The McKenzie and Willis building on High Street with damage to the top storey. The side wall has crumbled, exposing the inside of the building where the roof has been propped up by scaffolding. The front facade of the building is also damaged and is held upright by steel bracing.
The upper section of the Durham Street Methodist Church. Scaffolding has been constructed to allow workers from the South Island Organ Company to retrieve the church's valuable and historic organ. The windows at the far end have been weather proofed with plywood and strengthened with timber bracing.
St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets. Scaffolding has been placed around the left dome of the building which was damaged during the 4 September earthquake. Plastic has also been placed over the dome to protect the inside from weather damage.
St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets. Scaffolding has been placed around the left dome of the building which was damaged during the 4 September earthquake. Plastic has also been placed over the dome to protect the inside from weather damage.
On a walk around the neighbourhood, December 3, 2013, Christchurch New Zealand. www.stuff.co.nz/the-press/christchurch-life/avenues/featu...
A cordoned off area in Christ's College where bricks from the heritage buildings have been removed and stacked. Scaffolding can be seen on the building in the distance and a prefab building to the right which was being used as classrooms while the buildings are still unsafe to enter.
A photograph of the Durham Street Methodist Church which collapsed during the 22 February 2011 earthquake. All that is left is a small section of the front wall. A large pile of masonry sits in front. To the left, scaffolding indicates the height of the building before it collapsed.
A photograph captioned by BeckerFraserPhotos, "The failed column near the south-east corner of the ground floor of the Hotel Grand Chancellor. This corner of the building slumped 700mm when this column and a nearby sheer wall failed. Scaffolding was erected all around it and then sprayed with concrete to stabilise the building".
A photograph captioned by BeckerFraserPhotos, "The failed column near the south-east corner of the ground floor of the Hotel Grand Chancellor. This corner of the building slumped 700mm when this column and a nearby sheer wall failed. Scaffolding was erected all around it and then sprayed with concrete to stabilise the building".
Christ Church Cathedral, Christchurch, with spire being rebuilt after the 1901 earthquake. Photographer unidentified. The nave, tower and spire of Christchurch Cathedral was completed in 1881. Work on completeing the rest of the building began in 1900. In 1902 the transcepts were finished and work started on the chancel and apse. An earthquake in 1901 cracked the upper part of the spire in two places. In this photograph which dates from late 1902/1903 (see scaffolding beyond the transcept indicating work on chancel) the upper part of the spire has been removed by Messrs Graham and Greig in preparation for replacing this section with a copper covered wooden structure. The Cathedral was completed in 1904. (Information from "Vision and Reality; Christchurch Cathedral in the Square," Colin Brown, Christchurch, 2000 and "A Dream of Spires," Ian Lochhead, Canterbury University Press, 1999, page 153.) Preparation for erecting the scaffolding was reported in the Christchurch Star 15 January 1902. The cross was replaced on the top of the new copper covered wooden section of the spire on 29 June 1903. Source of descriptive information - Notes on file print. Source of title - Title supplied by Library Quantity: 1 b&w original negative(s). Physical Description: Glass negative
A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. the ceiling of the building has been braced with scaffolding. Wire fencing and police tape has been placed around the building as a cordon.
A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. the ceiling of the building has been braced with scaffolding. Wire fencing and police tape has been placed around the building as a cordon.
A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. the ceiling of the building has been braced with scaffolding. A red sticker on the door indicates that the building is unsafe to enter.
A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. The ceiling of the building has been braced with scaffolding. Wire fencing and police tape has been placed around the building as a cordon.
A photograph of two people in front of the base of the John Robert Godley statue in Cathedral Square. The base of the statue has scaffolding and loudspeakers around it, for a Canterbury Tales performance as part of FESTA 2013. In the background is the damaged Christchurch Cathedral and the art installation 'Planted Whare' by Chris Heaphy.
A photograph of a piece of plywood sitting on top of a pile of bricks from the Carlton Hotel. USAR codes have been spray-painted on the wood. In the foreground, metal fencing, cordon tape and a road cone have been used to cordon off the building.
A photograph of the earthquake damage to the Cycle Trading store on Manchester Street. The gable of the store has collapsed, and bricks and other rubble have fallen onto the footpath in front. A car parked on the street has been crushed by the fallen rubble. The word "Clear" has been spray-painted on the front of the car. Wire fencing has been placed around the building as a cordon.