Exposed side of the Cathedral Junction building.
Exposed side of the Cathedral Junction building.
Exposed side of the Cathedral Junction building.
Damage to the Cathedral of the Blessed Sacrament. Detail of the sculpture on top of the cathedral.
Christchurch's Cathedral
Christchurch's Cathedral
The Cathedral
Cathedral Square.
A photograph of a pile of rubble in front of the Cathedral of the Blessed Sacrament on Barbadoes Street. The rubble has landed on a car and crushed it. Wire fencing has been placed around the cathedral as a cordon.
A couple of city blocks away from the now damaged Cathedral a temporary $4million cathedral has been built using large cardboard tubes and sheeting.
A photograph taken in Cathedral Square, looking north.
A photograph taken in Cathedral Square, looking north.
A photograph taken in Cathedral Square, looking west.
A photograph taken in Cathedral Square, looking north.
Photograph captioned by BeckerFraserPhotos, "ChristChurch Cathedral".
Photograph captioned by BeckerFraserPhotos, "Cathedral".
A photograph taken in Cathedral Square, looking south.
Damage to the Cathedral of the Blessed Sacrament.
A photograph taken in Cathedral Square, looking west.
Damage to the northwest corner of the Cathedral.
The Cathedral of the Blessed Sacrament, seen before the earthquakes.
A model of the ChristChurch Transitional Cathedral made predominantly out of laser cut and engraved coloured acrylic as well as timber dowels to represent the cardboard tubes.
Wednesday 2 May 2012.
File reference: CCL-2012-05-02IMG_2159
From the collection of Christchurch City Libraries.
Tuesday 27 March 2012.
File reference: CCL-2012-03-27-IMG_0746
From the collection of Christchurch City Libraries.
The Cathedral of the Blessed Sacrament after the dome was removed. Large cracks are visible in the walls and in the dome's supporting structure, and the facade is supported by haybales and shipping containers. The photographer comments, "The main dome of the Cathedral of the Blessed Sacrament became unsafe after the February Christchurch earthquake - workmen have slowly been dismantling it. Now we are just left with the cracked and twisted walls that supported the beautiful dome".
The Cathedral of the Blessed Sacrament, Christcurch, after the 6.3 magnitude quake on 22 February 2011. The dome has now been taken down (and is on the ground on the right side of this image) and you can see the orange and green of the workmen's hi-vis in the tower section.
A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade.
A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade.
A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade.
A photograph of a detail of the front of Christ Church Cathedral. A stained-glass window remains intact despite the collapsed stonework that surrounds it.