A Treetech Specialist Treecare Ltd truck on River Road in Richmond. The photographer comments, "Treetech did a lot of work making trees and power lines safe".
Ongoing repair and deconstruction work on Victoria Street. The car park to the left of the image was left after the demolition of a building.
The public walking through and taking photographs of the ongoing deconstruction and construction work in the CBD. Two diggers can be seen in the background.
Reconstruction work on Our City-O-Tautahi, located in the former Municipal Chambers. Extensive bracing can be seen on front wall of the building.
At an event held to thank the Student Volunteer Army, Op Shop's Jason Kerrison signs a shovel representative of the hard work by the students.
At an event held to thank the Student Volunteer Army, Mayor Bob Parker signs a shovel representative of the hard work by the students.
A photograph of repair work on the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of repair work on the Rendezvous Hotel. The photograph is captioned by Paul Corliss, "Central city, from Manchester Street".
Text reads 'Parking wardens resume work in Christchurch'. A parking warden peers anxiously at a huge tanker named 'Bill's Septic Tank Services' which is apparently parked illegally. The driver of the tanker, who holds the nozzle of a pump attached to the tank, says 'Your move!' suggesting the threat of a sewage spill if the warden insists on compliance. Context - 'After a lengthy grace period following the devastating February 22 quake, Parking wardens were yesterday on the hunt for parking infringers in the city's non-metered time-restricted zones, loading zones, bus/tour coach stops and taxi stands, and on the likes of broken yellow lines.' The resumption of work by the parking wardens does suggest a return to normal in Christchurch. (NZHerald 30 May 2011)
Colour and black and white versions available
Quantity: 2 digital cartoon(s).
The damaged clock tower on Victoria Street, wrapped and braced to prevent further damage. The photographer comments, "Diamond Jubilee Clock Tower in Christchurch. Its legs wrapped up for protection. Volcanic stone and limestone clock tower with ornate wrought iron work with coloured glass around part of the tower and four clock faces. Clock Tower built in this location to commemorate the Diamond Jubilee of Queen Victoria. Has two white marble plaques and one bronze plaque set on stone work above arches".
Best View - Press "L".
After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it.
See Video of TV3 News item:
Demolition work on Christchurch's "distinctive" former civic building and the Front Runner store. On a walk around Christchurch May 9, 2013 New Zealand.
Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department s...
Photograph captioned by Fairfax, "Staff at Halswell New World supermarket work to stock the shelves after the latest big quake".
Damage to the interior of the Durham Street Methodist Church. Plaster has come off the wall, baring the stone work.
Damage to the interior of the Durham Street Methodist Church. Plaster has come off the wall, baring the stone work.
Damage to the interior of the Durham Street Methodist Church. Plaster has come off the wall, baring the wood work.
A view over the Avon River towards Oxford Terrace. A small digger can be seen at work to the left.
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work on Hackthorne Road, Cashmere".
Damage to the interior of the Durham Street Methodist Church. Plaster has come off the wall, baring the stone work.
Photograph captioned by Fairfax, "Jeanette Stark and co-owner Tony Francis keen to get back to work at Henry Africa's".
Photograph captioned by BeckerFraserPhotos, "The city library administration is moving into this work space near the new bus exchange".
A photograph submitted by Anonymous to the QuakeStories website. The description reads, "Damage at work (that should be flat and level…), Feb 22nd.".
View down Hereford Street, looking west from Madras Street. Road work signs and a crane can be seen in the distance.
Look through the cordon fence, a worker supervising the demoliton work on the Amuri Courts. Another worker and a digger can be seen in the background.
A photograph of an office in the Diabetes Centre. The office furniture has been pushed together to prepare the room for earthquake repair work.
Sam Johnson, Student Volunteer Army Organiser and Opshop's Jason Jerrison at an event held at NZi3 to thank the volunteers for the work being done.
More damage to the Christchurch Chinese Methodist Church following the 22 February earthquake. The church already had its spire removed so restoration work can be carried out.
Vice Chancellor Rod Carr preparing to enter and retrieve his work from the 6th floor of the Registry Building, with an emergency and security staff member.
At a meeting in a tent, Vice-Chancellor Rod Carr speaks to staff about their return to work after the February 2011 earthquake. The photographer comments, "Staff briefing".
More damage to the Christchurch Chinese Methodist Church following the 22 February earthquake. The church already had its spire removed so restoration work can be carried out.