Piles of rubble along Kilmore Street. A digger can be seen in the background as well as a construction worker in a hard hat and high-visibility vest. The rubble has been separated into different piles.
A photograph showing large piles of bricks from collapsed and demolished buildings.
A photograph captioned by BeckerFraserPhotos, "Ground floor of the Holiday Inn. We could see piles of different types of materials sorted and bagged through the windows here".
Demolition along Kilmore Street. A digger can be seen as well as a construction worker with a high hat and high-visibility vest. The rubble has been separated into different piles.
The site of a demolished building on Hereford Street, with a crane and two skips. Piles of rubble can be seen to the left. The site has been cordoned off with wire fencing.
The laying of new sewers in Bridge Street, South Brighton. Road cones have been placed along the road works. Temporary road signs indicate that the current speed limit is 30 km/h. Diggers, four-wheel drive vehicles and a truck are parked beside piles of gravel and a yellow sewer pump.