One cylindrical copper time capsule with soldered ends containing rolled copies of the Christchurch Times and The Press from 25 March 1931, along with a document detailing the placement of the time capsule by the then North Canterbury Hospital Board; one end of the capsule has been removed to allow access. The North Canterbury Hospital Board pl...
A photograph of the Cathedral of the Blessed Sacrament taken from Ferry Road, over Cathedral College. The copper dome has been removed from the tower, exposing the wooden structure underneath.
A photograph showing a relief of a lion's head on the copper trim at 690 Colombo Street.
One artwork in the shape of a stag's head, made from recycled copper and flattened corrugated iron. The item could be used as a coat hook.
A photograph of Whole House Reuse item 259. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A thumbnail photograph of Whole House Reuse item 259, cropped for the catalogue. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
On a walk over to Hagley Park to great some shots of the wonderful Cherry Blossom I past by the Knox Church rebuild and found that the scaffolding has come down at last. It sure was shinning in the midday light.
Victoria Street September 12, 2014 Christchurch New Zealand
Christ Church Cathedral, Christchurch, with spire being rebuilt after the 1901 earthquake. Photographer unidentified.
The nave, tower and spire of Christchurch Cathedral was completed in 1881. Work on completeing the rest of the building began in 1900. In 1902 the transcepts were finished and work started on the chancel and apse. An earthquake in 1901 cracked the upper part of the spire in two places. In this photograph which dates from late 1902/1903 (see scaffolding beyond the transcept indicating work on chancel) the upper part of the spire has been removed by Messrs Graham and Greig in preparation for replacing this section with a copper covered wooden structure. The Cathedral was completed in 1904.
(Information from "Vision and Reality; Christchurch Cathedral in the Square," Colin Brown, Christchurch, 2000 and "A Dream of Spires," Ian Lochhead, Canterbury University Press, 1999, page 153.)
Preparation for erecting the scaffolding was reported in the Christchurch Star 15 January 1902. The cross was replaced on the top of the new copper covered wooden section of the spire on 29 June 1903.
Source of descriptive information - Notes on file print.
Source of title - Title supplied by Library
Quantity: 1 b&w original negative(s).
Physical Description: Glass negative