It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect.
It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect.
It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect.
It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect..
It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect.
It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect.
None
None
None
None
None
None
Porritt Park was, before the earthquakes, the headquarters of hockey in this region. Two astro-turf fields (the main one was other side of the building), and corporate offices etc.
The earthquakes buckled all the playing surfaces and damaged the buildings; a couple of smaller ones have been removed.
Hockey shifted the other side of the city t...
Porritt Park was, before the earthquakes, the headquarters of hockey in this region. Two astro-turf fields (the main one was to the left of the building), and corporate offices etc.
The earthquakes buckled all the playing surfaces and damaged the buildings; a couple of smaller ones have been removed.
Hockey shifted the other side of the cit...
The permanent closure (to motor vehicles) of the Bexley red zone streets has started.
This was once the main south-north route just west of the Avon River in the New Brighton area, till an expressway (ring road) was built about 80m to the west (right) about 12-13 years ago. Then it became just another suburban street, but now all the houses ...
The Forsyth Barr building has stood silent and empty (except the occasional intruder and pigeons) since the February 2011 earthquake. It was sold "as is" and I understand that it is now going to be fitted out as a hotel. This is the building that had severe stairwell damage during the quake necessitating people being lowered via ropes etc on t...
The South New Brighton jetty was rebuilt a couple of years before the 2010 and 2011 earthquakes wrecked it. Then, it was straight, level and all railings on left side were intact. Was closed to the public for about four years but is open now.
This is a temporary pile of silt piled on the old Bexley landfill sight. Some trucks are addng to the pile, while other truck and trailer units are taking it away to the old Bottle Lake landfill sight, a few km to the north of here.
One of the most beautiful pieces of wall art (added to the blank walls after buildings were demolished following the earthquakes) in Christchurch, is now being hidden by a new building in front of it.
www.flickr.com/photos/johnstewartnz/15499321681/in/...
A historic plate smashed in the February Christchurch earthquake. Ashley Gorge Scenic Reserve was established by my Great-Grandmother (maternal) many years ago.
Built in the early 1960s for the Lyttelton Road Tunnel, it was severley damaged in the February 2011 earthquake and is not currently used.
Demolition of the relatively new seven-storey Waters Edge Apartments in Ferrymead continues. CERES Environmental NZ are doing the job for CERA (Canterbury Earthquake Recovery Authority).
Some will be pleased to see this block go as there was lot of resentment to it being built on the site of the old Ferrymead Tavern,
Selected for Explore, #347...
None
The South New Brighton jetty was rebuilt a couple of years before the earthquakes wrecked it. Was closed to the public for about four years but is open now.
The sea wall at Beachville Road, Redcliffs, after the earthquake. It used to be straight and level - not now!
As a teenager I went fishing off this wall.
The Subway shop in the High Street Mall has not operated since lunch time on the 22nd February 2011 when the most damaging of Christchurch and Canterbury's earthquakes struck. I assume the building is still to be demolished.
A section of retaining wall that tilted in the Christchurch 2011 earthquake. At the Edmunds Band Rotunda sight. Still not repaired,
Pigeons sit on the remains of one of the tallest buildings in Christchurch that was 95% demolished two or three years ago. The basement (now filled with water) and the columns remain.
Demolished due to damage from the Christchurch 2011 earthquake.
20160419_7732_7D2-400 The City is in Rebuild phase (110/366)
A totally different view to a few years ago. Most of the tall buildings have gone and construction is underway on a lot of new buildings, View from across the Estuary in Redcliffs.
A couple of days ago the government agency controlling the post-earthquake work (CERA - Canterbury Ea...
Cleaning up Manning Signs of the silt from liquefaction. Three fellow workers man the shovels while two building engineers talk to the boss (hidden). After doing the car park we then turned our hands to the inside of the factory, once clearance was given that we could go inside.