The earthquake re-pair work has started on the Knox Church on Bealey Avenue, August 14, 2013 Christchurch New Zealand.
While building after building is torn down in Christchurch, plans are in place to ensure as much of a 131-year-old church is retained as possible.
Knox Church on Bealey Avenue suffered major damage in the February 22 earthquak...
Christchurch CBD
New Zealand
31 August 2011
Re:START Mall, Cashel Street, Christchurch.
Friday 22 February 2013. File reference: CCL-2013 -02-22-IMG_4090
From the collection of Christchurch City Libraries.
Friday 22 February 2013. File reference: CCL-2013 -02-22-IMG_4089
From the collection of Christchurch City Libraries.
None
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Hardy Street/Owles Terrace corner (beside the boat launching ramp), New Brighton
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9200
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9204
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07--IMG_9194
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-MG_9201
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9203
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07IMG_9207
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07IMG_9202
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9198
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07IMG_9197
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9211
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9208
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9196
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9215
From the collection of Christchurch City Libraries.
Demolition work on Brannigans building, Gloucester Street.
File reference:
CCL-2012-02-07-IMG_9195
From the collection of Christchurch City Libraries.
Closed due to earthquake damage. But it looks in better condition than the building I work in!
Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand.
www.stuff.co.nz/the-press/news/christchurch-earthquake-20...
All about our ear...
Demolition work on Christchurch's "distinctive" former civic building and the Front Runner store. On a walk around Christchurch May 9, 2013 New Zealand.
Demolition work on Christchurch's "distinctive" former civic building is under way. The category-2 heritage building was designed by G A J Hart and opened in 1939 as the Miller's department s...
Best View - Press "L".
After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it.
See Video of TV3 News item:
Tiler at work on the steps of Ambrose Heal.
File Ref: CCL-2011-03-17-St Albans-IMG_0376
From the collection of Christchurch City Libraries.
The city side of the South Brighton bridge. Approaches on both sides will need extensive work before this bridge can re-open.
Cheerful coffee place if you don't mind the ambience of men at work.
File Ref: CCL-2011-03-17-St Albans-IMG_0378
From the collection of Christchurch City Libraries.
Work is continuing on the earthquake damaged South New Brighton bridge. Avon River to the left, Avon-Heathcote Estuary the other side of the bridge.