Photograph captioned by Fairfax, "A steady stream of customers queue for Christchurch Press' earthquake book".
Photograph captioned by Fairfax, "Prince William, Mayor Bob Parker. His Royal Highness Prince William visits the EOC centre in the Christchurch Art Gallery".
Photograph captioned by Fairfax, "Pupils at St James School with their coin trail, created to raise money for St James Catholic School in Christchurch affected by the earthquake".
Photograph captioned by Fairfax, "Pupils at St James School with their coin trail, created to raise money for St James Catholic School in Christchurch affected by the earthquake".
Photograph captioned by Fairfax, "Christchurch CBD was 'yarn-bombed' during the weekend using yarn and fabric pieces to brighten public areas and earthquake-affected spaces. Hope sign at Hereford and Manchester Streets".
Photograph captioned by Fairfax, "Civil Defence Centre has now moved from the Christchurch Art Gallery to the new civil offices in Hereford Street. Invercargill Mayor Tim Shadbolt has been working on the phones for the last two days".
A black and white photograph of a sign reading "A tidy standard of dress is required." In the foreground is a pile of building rubble. The photographer comments, "I reversed this picture in the interests of my followers as it was harder to read the right way round. The wrecking crew did not wear ties, but they did look neat in their orange vests".
A scanned copy of a black and white photograph belonging to University of Canterbury alumnus Colin Lau. Colin describes the photograph as follows: "A view from UCSA towards the (right side of our) Science Building. I am not sure what that target white building behind the lamp standard is. I still remember that little wooden bridge we walked across to the UCSA building & that meandering creek or stream that flows beneath it".
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. 5. In your opinion, is there a better way to report on these recovery issues? We believe that, as regards residential recovery, monitoring should extend to code compliance certificates. According to figures published in 2014, only factions of repairs/rebuilds are completed with the issue of a code compliance certificate. To conclude the work to the required standard, someone must pay for the code compliance. Leaving things as they are could have serious negative consequences for the recovery and for the city as a whole. We suggest an investigation of number of outstanding code compliance certificates and that responsible parties are made to address this outstanding work. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents."
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Seismic Risk. One thing we can learn from the past is that seismic risk in Canterbury has been underestimated before the earthquakes struck. This is confirmed in a report for EQC in 1991 (paper 2005). It is also the conclusion of the Royal Commission in the CTV report. A number of recommendations have been made but not followed. For example, neither the AS/NZS 1170.5 standard nor the New Zealand Geotechnical Society guidelines have been updated. Yet another recovery instrument is the Earthquake Prone Building Act, which is still to be passed by Parliament. As the emergency response part of the recovery is now behind us, we need to ensure sustainability for what lies ahead. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents."