A photograph of a panel hanging from the ceiling of the Diabetes Centre.
A photograph of a room in the Diabetes Centre with missing ceiling tiles.
A photograph of a panel hanging from the ceiling of the Diabetes Centre.
A photograph of a ceiling in the Diabetes Centre with several missing panels.
A photograph of ceiling tiles stacked outside of a building at the University of Canterbury. Two skips to the right have also been filled with tiles.
A photograph of a room in the Diabetes Centre with a loose ceiling panel. There is a crack above the left-hand corner of the door.
A photograph of several panels hanging from the ceiling of the Diabetes Centre. The panelling has been taken off the wall to the right, exposing the wooden structure beneath.
A photograph of an office in the Diabetes Centre which has been prepared for earthquake repair work. Furniture and other office materials have been stacked in the corner of the room. Several tiles are missing from the ceiling above.
A photograph of a room in the Diabetes Centre which has been wrapped in plastic. There is a step ladder in the background and several work tools on the covered furniture. Several tiles are missing from the ceiling above.
Workers adding ceiling panels to the space under the library.
Workers adding ceiling panels to the space under the library.
Workers reparing the damage to the ceilings in the central library.
Scaffolding in the James Hight Library allowing workers to reach the ceiling.
New ceiling installed in a lecture theatre in the College of Engineering.
New ceiling installed in a lecture theatre in the College of Engineering.
New ceiling installed in a lecture theatre in the College of Engineering.
A photograph of the earthquake damage to the ceiling of the Fisher's Building.
A photograph of earthquake damage to the ceiling of St Paul's-Trinity-Pacific Church.
A photograph of earthquake damage to the ceiling of St Paul's-Trinity-Pacific Church.
Photograph captioned by Fairfax, "Missing ceiling panels at The Press, following the Canterbury earthquakes".
New ceiling installed in the E8 lecture theatre in the College of Engineering.
New ceiling installed in the E8 lecture theatre in the College of Engineering.
New ceiling installed in the E8 lecture theatre in the College of Engineering.
New ceiling installed in the E8 lecture theatre in the College of Engineering.
Two workers on a cherry picker replace the ceiling tiles in the James Hight Library.
Two workers on a cherry picker replace the ceiling tiles in the James Hight Library.
Two workers on a cherry picker replace the ceiling tiles in the James Hight Library.
Two workers on a cherry picker replace the ceiling tiles in the James Hight Library.
Two workers on a cherry picker replace the ceiling tiles in the James Hight Library.
Two workers on a cherry picker replace the ceiling tiles in the James Hight Library.