SCIRT minimum standard for working around services
Articles, UC QuakeStudies
A document which stipulates SCIRT's minimum standard for managing the risks arising from working around services.
A document which stipulates SCIRT's minimum standard for managing the risks arising from working around services.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "OVTRK Registry Changes - working with CINCH".
An entry from Deb Robertson's blog for 27 April 2016 entitled, "a few thoughts on being a full time single parent and working".The entry was downloaded on 3 November 2016.
A guideline created for SCIRT Delivery Teams which outlines the requirements for working around heritage items.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.
A submission produced by the consultancies for the ACENZ Innovate NZ Awards of Excellence 2016, providing details about how the design team supporting SCIRT was formed, and how successful design delivery was achieved.
A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.
A document that outlines objectives and ways of working collaboratively, which team members signed to show their commitment.
A document which outlines how to work safely at height and depth, created to discuss with site staff at on-site "toolbox talks".
A presentation which outlines SCIRT's approach to raising the visibility of and enabling women working in construction across the SCIRT programme.
A tool, including an outline and run sheet, used by the SCIRT Communication Team when delivering a series of workshops to SCIRT engineers about working around businesses.
A tool, including an outline, resources and a survey sheet, used by the SCIRT Communication Team when delivering a series of toolboxes to SCIRT subcontractors about working around businesses.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
Following the February 2011 earthquake, the Canterbury Branch of the TEU surveyed members to determine the psychological and physical impact of the earthquakes on members, in particular on their working conditions and ability to participate in consultation processes. 90 members responded, and this report gives a summary of the responses to short-answer questions and overall themes.
Following the February 2011 earthquake, the Canterbury Branch of the TEU surveyed members to determine the psychological and physical impact of the earthquakes on members, in particular on their working conditions and ability to participate in consultation processes. 90 members responded, and this report gives a summary of the percentage of responses received for each survey question.
A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.