Risk Management Plan
Articles, UC QuakeStudies
A plan which defines the risk and opportunity management activities to be applied by SCIRT to meet SCIRT objectives. The first version of this plan was produced on 12 September 2011.
A plan which defines the risk and opportunity management activities to be applied by SCIRT to meet SCIRT objectives. The first version of this plan was produced on 12 September 2011.
A tool which outlines the eight critical risks applicable to the SCIRT programme, and sets out minimum standards for addressing these risks. This tool was created in 2014.
A poster which illustrates each of SCIRT's eight critical risks.
A document that defines the requirements and objectives of design activities for SCIRT's reconstruction of the city's horizontal infrastructure and describes how these activities should be implemented.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
An early swim lane diagram which visually distinguishes responsibilities for SCIRT's ECI process.
A paper written by Paul S Botha and Eric Scheepbouwer for the Transportation Research Record: Journal of the Transportation Research Board, No. 2504, Transportation Research Board, Washington, D.C., 2015, pp. 66-72.
A document which discusses the importance of the ECI process at SCIRT.
A document which outlines the roles, responsibilities and deliverables of people involved with the SCIRT ECI process.
A document which outlines the purpose and processes associated with ECI at SCIRT.
An entry from Deborah Fitchett's blog for 14 November 2011, posted to Dreamwidth. The entry is titled, "In which she risks packing anxiety dreams".The entry was downloaded on 16 April 2015.
An entry from Deborah Fitchett's blog for 14 November 2011, posted to Livejournal. The entry is titled, "In which she risks packing anxiety dreams".The entry was downloaded on 13 April 2015.
A design guideline which provides guidance to designers on how to carry out a whole of life evaluation of rebuild options.
A paper which details earthquake expectation data, supplied to SCIRT by GNS Science.
A pdf copy of a spreadsheet tool used by designers to undertake a whole of life evaluation of rebuild options.
A story submitted by Jo Nicholls-Parker and Petra Van Asten to the QuakeStories website.
A document which outlines how to work safely around underground services, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to work safely in confined spaces, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to safely carry out lifting operations, created to discuss with site staff at on-site "toolbox talks".
A document which stipulates SCIRT's minimum standard for managing the risks arising from working around services.
An entry from Deb Robertson's blog for 10 February 2012 entitled, "Thinking about February 22....".
A document which contains several examples of SCIRT Safety Alerts, which were documents sent out to inform and educate all site staff after an incident.
A document which outlines how to work safely in trenches and excavations, created to discuss with site staff at on-site "toolbox talks".
An entry from Deb Robertson's blog for 27 May 2013 entitled, "The Hottie Project 2013".
A bowtie diagram which SCIRT used to evaluate the risks associated with and analyse the causal relationships associated with service strikes.
A document which outlines how to work safely with powered plant and tools, created to discuss with site staff at on-site "toolbox talks".
A story submitted by Rosie Belton to the QuakeStories website.
A story submitted by Becky to the QuakeStories website.
A document which outlines how to work safely at height and depth, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to keep site staff and public safe around mobile plant, created to discuss with site staff at on-site "toolbox talks".