Search

found 5 results

Articles, UC QuakeStudies

A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.

Articles, UC QuakeStudies

A PDF copy of a document detailing a ten-step 'recipe' for the All Right? campaign. The document provides a framework for the implementation of similar campaigns by different groups and in different contexts, while including information about the background and implementation of the All Right? campaign itself.

Articles, UC QuakeStudies

A document that defines the requirements and objectives of design activities for SCIRT's reconstruction of the city's horizontal infrastructure and describes how these activities should be implemented.