QuakeStory 169
Articles, UC QuakeStudies
A story submitted by Dave to the QuakeStories website.
A story submitted by Dave to the QuakeStories website.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
A document which contains a set of procedures for the "best practice" mark out and recording of subsurface utilities.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A management plan which describes how SCIRT will coordinate utility authorities and utility relocations.
A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.
A document which describes the processes and procedures SCIRT designers and delivery teams had to follow to locate and protect utilities.