Search

found 368 results

Articles, Christchurch uncovered

Did you ever wonder where the concept of locking things up came from? The reality of human nature seems to be that ever since people have owned things that are deemed valuable, they need to be protected from theft. Not … Continue reading →

Articles, UC QuakeStudies

A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.

Articles, UC QuakeStudies

A PDF copy of the site map for CityUps. CityUps was a 'city of the future for one night only', and the main event of FESTA 2014. It was held on vacant sites at the intersection of Lichfield Street, Manchester Street and High Street. Architecture students from Unitec, The University of Auckland and CPIT collaborated with local businesses to create large-scale, temporary structures to entertain the public.

Articles, Christchurch uncovered

Beware the darkness, children, for there be monsters We love to characterise the dark as something to be feared, the territory of nightmares, of ghouls and ghosts and things that go bump. In our collective psyche it belongs to the … Continue reading →

Articles, UC QuakeStudies

A Gap Filler submission to the Christchurch City Council Draft City Plan on behalf of the Gap Filler Trust, Greening the Rubble Trust and Life in Vacant Spaces Charitable Trust. The submission recommeded that the Christchurch City Council retain the funding levels for these intiatives at 2012 levels ($565,000) rather than reduce them to $400,000 as proposed, and that this funding be tagged for projects citywide and not restructed to the central city.

Articles, UC QuakeStudies

An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.