DG012 Roading Terminology
Articles, UC QuakeStudies
A guideline which provided clarity to designers, asset owners and others on the meaning of terminology to describe the type of roading works proposed/undertaken.
A guideline which provided clarity to designers, asset owners and others on the meaning of terminology to describe the type of roading works proposed/undertaken.
A pdf copy of a work notice issued by SCIRT giving an overview of the Beachville Road seawall rebuild project.
A document which describes the process that SCIRT took to repair the Sumner Road retaining wall - stage 4.
A report which details the archaeological investigations carried out during the course of SCIRT projects 11115 and 11159, wastewater renewal work and storm water repair work on Ferry Road.
An entry from Deborah Fitchett's blog for 7 May 2014, posted to Dreamwidth. The entry is titled, "In which she submits her hatred of Riccarton Road".The entry was downloaded on 14 April 2015.
An entry from Deborah Fitchett's blog for 8 April 2012, posted to Dreamwidth. The entry is titled, "In which she decorates a road cone for Easter".The entry was downloaded on 16 April 2015.
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
An entry from Deborah Fitchett's blog for 8 April 2012, posted to Livejournal. The entry is titled, "In which she decorates a road cone for Easter".The entry was downloaded on 13 April 2015.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A document which describes how the new Beachville Road seawall was built.
A pdf copy of a drawing for children focusing on diggers and road cones.
A pdf copy of a presentation which describes the stages of construction of the Beachville Road seawall.
A document which outlines the communication strategy behind the Lonely Cone campaign.
A media release which outlines the outcomes of the campaign to reclaim Christchurch cones.
A PowerPoint presentation which evaluates and analyses the effectiveness of The Lonely Cone Recall campaign.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A best practice traffic management guideline, produced in February 2014, which helps traffic management team members manage cyclists through road work sites safely.
A best practice traffic management guideline, produced in February 2014, which helps traffic management team members slow motorists through road work sites safely.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A promotional brochure explaining the Forward Works Viewer and that the tool was a key to cost-effective and efficient project delivery in Christchurch.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.