Search

found 6 results

Articles, UC QuakeStudies

This report was the first report in the district series, and has a different format to later reports. It includes all natural hazards, not only earthquake hazards. It describes earthquake, flooding, meteorological, landslide and coastal hazards within Hurunui district and gives details of historic events. It includes district-scale (1:250,000) active fault and flood hazard maps. The report describes an earthquake scenario for a magnitude 6.9 earthquake near Cheviot, as well as flooding, meteorological, landslide, coastal erosion, storm surge, and tsunami scenarios.

Articles, UC QuakeStudies

This report was the first report in the district series, and has a different format to later reports. It includes all natural hazards, not only earthquake hazards. It describes earthquake, flooding, meteorological, landslide and coastal hazards within Hurunui district and gives details of historic events. It includes district-scale (1:250,000) active fault and flood hazard maps. The report describes an earthquake scenario for a magnitude 6.9 earthquake near Cheviot, as well as flooding, meteorological, landslide, coastal erosion, storm surge, and tsunami scenarios. See Object Overview for background and usage information.

Articles, UC QuakeStudies

A copy of a letter from Seamus O'Cromtha which was sent to the Chief Executive of the Ministry of Business, Innovation and Employment (MBIE) on 3 September 2016. The letter was sent on behalf of Empowered Christchurch. In the letter, O'Cromtha calls on the Chief Executive to instruct the Christchurch City Council to stop issuing building consents in areas such as the Avon River floodplain until stop banks have been erected along the river. O'Cromtha comments, "Properties that should be protected by stop banks currently have no protection against flooding".