Armagh Street bridge - heritage diary
Articles, UC QuakeStudies
A document which details Downer's approach to heritage management when repairing the Armagh Street bridge.
A document which details Downer's approach to heritage management when repairing the Armagh Street bridge.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
A brochure created for Beca Heritage Week 2014, outlining SCIRT's repair work on heritage structures in the Central City. It was handed out to members of the public at SCIRT's walk and talk tours.
Posters created for Beca Heritage Week 2014, outlining SCIRT's repair work on the Armagh Street and Colombo Street bridges in the Central City. They were hung on the bridges for members of the public to read during SCIRT's walk and talk tours.
An entry from Jennifer Middendorf's blog for 29 August 2014 entitled, "Day off".
A paper published in the Management, Procurement and Law Journal Volume 168 Issue MP3, which describes a different form of alliancing.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A pdf copy of a spreadsheet tool used by designers to undertake a whole of life evaluation of rebuild options.
A copy of the program for the screenings of Elizabeth Guthrey's film series 'Dancing Through Impermanent Spaces'. The films are a creative response to the earthquakes in Christchurch and were shown as part of the Christchurch Body Festival 2014.
A web story about the model design work by Christ's College pupils.
A document describing the early warning system to alert team members of ground and structural movement at the Arch.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.
A bowtie diagram which SCIRT used to evaluate the risks associated with and analyse the causal relationships associated with service strikes.
A pdf copy of a presentation delivered at Building a Better New Zealand (BBNZ 2014) Conference. The presentation examines the relationship between innovation and productivity improvement in the construction industry.
A paper for the SCIRT Board which requests that the Board provide support to SCIRT's Training Team with assisting to develop a civil trade qualification.
A presentation for the SCIRT Board which outlines the process that SCIRT's Training Team intended to take towards assisting with developing a civil trade qualification.
A paper describing the procedure and challenges associated with installing anchors through gabion baskets.
A magazine article which describes SCIRT's approach to training.
A paper which indexes standard SCIRT details and CSS details including all SCIRT details.
An example of a public flyer promoting good driver behaviour, handed out in areas of traffic detours or delays.
A pdf copy of a PowerPoint presentation which illustrates the locations where Duncan Gibb presented his Brunel lecture.
A presentation given to St Martin's primary school students about SCIRT work in Opawa and Hillsborough.
A document describing the use of a remotely operated hydraulic jaw crusher to avoid the need to make confined space entries.
A web story about a site visit to the Bridge and Arch by local school pupils.
A document describing the confined spaces "dummy run".
A document describing Downer's approach to containing bentonite when drilling micro piles for the new Arch foundations.
A document made available to people attending Duncan Gibb's Brunel lecture.