Central City Design Parameters
Articles, UC QuakeStudies
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A diagram created in 2011, showing the communication structure across rebuild agencies.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A brochure created for Beca Heritage Week 2014, outlining SCIRT's repair work on heritage structures in the Central City. It was handed out to members of the public at SCIRT's walk and talk tours.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A document containing examples of newsletters printed and distributed to the inner city businesses and residents, to prepare them for the upcoming SCIRT rebuild work and update them on the positive progress being made.
A document containing examples of items and activities SCIRT implemented as part of the programme to support businesses affected and disrupted by SCIRT central city rebuild work.
A web story about a site visit to the Bridge and Arch by local school pupils.
A PDF copy of a page on the EQ Recovery Learning site which linked to a YouTube video. In 2015, Christchurch hosted the biggest international cricket tournament ever to be played in New Zealand - the ICC Cricket World Cup. Take a look behind the scenes and through the eyes of some of Canterbury's most passionate cricketers as cricket makes its epic return to the Hagley Oval.
An advertisement from April 2016 informing residents that local businesses are still open, despite detours and roadworks.
A tool, in the form of an A5 card, given to workshop and toolbox participants, outlining five easy steps to minimise the impact of roadworks on businesses.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
A photograph taken in 2013, showing one of the 32 large 'Open for Business' signs placed on all of the main routes into the CBD.
A tool, including an outline, resources and a survey sheet, used by the SCIRT Communication Team when delivering a series of toolboxes to SCIRT subcontractors about working around businesses.
A tool, including an outline and run sheet, used by the SCIRT Communication Team when delivering a series of workshops to SCIRT engineers about working around businesses.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A document containing examples of items provided in a folder for businesses. These are taken to the initial face-to-face meeting with business owners to discuss the impact and disruption of upcoming SCIRT rebuild works.
Posters created for Beca Heritage Week 2014, outlining SCIRT's repair work on the Armagh Street and Colombo Street bridges in the Central City. They were hung on the bridges for members of the public to read during SCIRT's walk and talk tours.
A PDF copy of a page on the EQ Recovery Learning site which linked to a YouTube video. This short video provides an insight into the design and location of the Canterbury Earthquake Memorial, due to be completed in February 2017. We meet its designer Grega Vezjak, who shares his vision for the Memorial