A Gap Filler submission to the Christchurch City Council Draft City Plan requesting the permission to be heard at the public hearing with regards to changes to temporary activities and buildings.
A Gap Filler submission to the Christchurch City Council Draft City Plan requesting the permission to be heard at the public hearing with regard to the Transitional City Chapter of the Draft City Plan.
A Gap Filler submission to the Christchurch City Council Draft City Plan on behalf of the Gap Filler Trust, Greening the Rubble Trust and Life in Vacant Spaces Charitable Trust. The submission recommeded that the Christchurch City Council retain the funding levels for these intiatives at 2012 levels ($565,000) rather than reduce them to $400,000 as proposed, and that this funding be tagged for projects citywide and not restructed to the central city.
A PDF copy of pages 40-41 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Temporary City Libraries'. Photo: Tim Church. With permission: Christchurch City Council.
A PDF copy of pages 48-49 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Reconstruction: Conversations on a City'. Photo: Tim Church. With permission: Christchurch City Council.
A PDF copy of pages 38-39 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Rebuild Central'. Photo: Tim Church. With permission: Christchurch City Council.
A PDF copy of pages 44-45 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Colombo Street Temporary Streetscape'. Photo: Tim Church. With permission: Christchurch City Council.
A PDF copy of pages 46-47 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Central Station: Temporary Bus Exchange'. Photo: Tim Church. With permission: Christchurch City Council.
A PDF copy of pages 274-275 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Central City Plan (Draft Central City Recovery Plan for Ministerial Approval, December 2011)'. Photos with permission: CCC
General Manager of Community Services for the Christchurch City Council Michael Aitken writes about the 2010 Canterbury Earthquake.
A PDF copy of pages 42-43 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Oxford Terrace Temporary Streetscape and Interpretation'. Photo: Tim Church. With permission: Christchurch City Council.
A paper which outlines the observed damage to Christchurch City Council-owned retaining walls and the repair solutions developed.
A PDF copy of a letter from the Anglican Advocacy (formerly the Anglican Life Social Justice Unit), to Christchurch City Council requesting exemption from parking requirements for inner city east landowners.
Jessie Garland and Luke Tremlett References and acknowledgements Christchurch City Council. Garvin, J., 2001. A Building History of Northern New England. University Press of New England, New Hampshire. Insight Unlimited.
A pdf copy of feedback given by the One Voice Te Reo Kotahi organising group on the draft Christchurch City Preliminary Resilience Assessment.
A pdf copy of the One Voice Te Reo Kotahi organising group's submission on the Christchurch City Council's Long Term Plan.
A PDF copy of pages 272-273 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Events Village'. Photos with permission: CCC
A PDF copy of page 128 of the book Christchurch: The Transitional City Pt IV. The page documents the transitional project 'Redzone Data'.
A PDF copy of pages 312-313 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Magna Carta Christchurch: The Great Paper Model'. Photos: TEDxEQChch
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
A copy of a letter from Empowered Christchurch to Peter Sparrow, Director of Building Control and Rebuild at the Christchurch City Council, sent on 23 October 2014. The letter is a response to another letter sent by Peter Sparrow to Empowered Christchurch regarding existing use rights and exemptions from a building consent. In this letter, Empowered Christchurch requests furthur clarification from the Christchurch Building Consent Authority about these concepts.
A copy of a letter from Hugo Kristinsson which was sent to Helen Beaumont, Manager of the Natural Environment and Heritage Unit at the Christchurch City Council, on 17 June 2014. The letter was sent on behalf of Empowered Christchurch. It is about legislation which, according to Kristinsson, determines land below the mean high water spring to be public land. Kristinsson is concerned that this legislation will cause 'hundred or even thousands' of people to lose their assets. He urges the Council to 'have the land surveyed and to redefine the CMA [Crown Minerals Act] before land claims are settled'.
A PDF copy of pages 194-195 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Sumner Community-Led Masterplan'.
A PDF copy of pages 268-269 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'CCC Temporary Street Furniture'. Photos with permission: F3 Design
A PDF copy of pages 94-95 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Buskers Festival Relocation Around the Events Village'. Photo with permission: Buskers Festival
A consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
A PDF copy of pages 228-229 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Lions Transitional Facility'. Photos: Irene Boles
A PDF copy of pages 322-323 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'The Hope Bear and Giraffing Around'.
A copy of a letter from Seamus O'Cromtha which was sent to the Chief Executive of the Ministry of Business, Innovation and Employment (MBIE) on 3 September 2016. The letter was sent on behalf of Empowered Christchurch. In the letter, O'Cromtha calls on the Chief Executive to instruct the Christchurch City Council to stop issuing building consents in areas such as the Avon River floodplain until stop banks have been erected along the river. O'Cromtha comments, "Properties that should be protected by stop banks currently have no protection against flooding".
The Christchurch liquefaction study was initiated to better determine liquefaction susceptibility in Christchurch city. It aimed to improve on earlier liquefaction susceptibility maps, which were based on soil type and distribution, by incorporating soil strength data into liquefaction analysis. This stage of the study included collating available geological and geotechnical data from Environment Canterbury and Christchurch City Council into a database, modelling liquefaction hazard and ground damage and presenting these as maps. The report contains many recommendations, which were taken up in subsequent stages of the study. (Note that the results of Stage 1 of the Christchurch liquefaction study were provided to Environment Canterbury as a letter rather than a report. This was a summary of work completed to 30 June 2001, including a review of geological and geotechnical data available within Environment Canterbury and Christchurch City Council records.) See Object Overview for background and usage information.