Asset Owner's Representative Role Description - Stormwater
Articles, UC QuakeStudies
An example of a paper which explains the role of an Asset Owner's Representative - Stormwater at SCIRT.
An example of a paper which explains the role of an Asset Owner's Representative - Stormwater at SCIRT.
A submission produced by the consultancies for the ACENZ Innovate NZ Awards of Excellence 2016, providing details about how the design team supporting SCIRT was formed, and how successful design delivery was achieved.
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
A document which describes how SCIRT's governance structure was set up and developed in response to the many challenges of the horizontal infrastructure rebuild.
A paper describing the procedure and challenges associated with installing anchors through gabion baskets.
A document that defines the requirements and objectives of design activities for SCIRT's reconstruction of the city's horizontal infrastructure and describes how these activities should be implemented.
A diagram which shows outputs from PDAT calibration/validation (with explanations).
A document which details the structure, roles and terms of reference for the Client Governance Group (CGG).
A guideline which defined what is and isn't 'on job training', with the purpose of encouraging more 'on job training'.
A revised memorandum of understanding that sets out how SCIRT and Connexis planned to work together to build an industry training framework and skilled workforce.
A magazine article which describes SCIRT's approach to training.
A PDF version of the memento book created for those who contributed to the SCIRT programme.
A plan which details how in 2013 SCIRT planned to engage its workforce in training.
A diagram which illustrates the proposed structure of an industry-wide training advisory board.
A presentation prepared for the SCIRT board which outlines the need to pursue the establishment of an industry-wide training advisory board.
A diagram which illustrates the numbers of people trained to July 2016.
A paper which indexes standard SCIRT details and CSS details including all SCIRT details.
A paper prepared for the Water New Zealand 2014 conference which considers resilience lessons for reservoirs, pump stations and pipelines.
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
A design guideline which defined the role of the Technical Leads within SCIRT technical forums.
A guideline which defined the process and ownership of templates used by the design team and the management of the design team electronic library.
A presentation to the IPWEA conference of a paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
A paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.
A plan which outlines how timely and accurate information relating to estimating, actual project costs, future commitments and total forecast cost will be managed and reported for each project phase in the programme. The first version of this plan was produced on 24 June 2011.
A plan which provides SCIRT with clear direction and guidelines regarding communication in the event of a crisis. The first version of this plan was produced on 1 December 2013. Note that personal details of key personnel have been removed from this document.
A plan which sets out how SCIRT will carry out internal communication over the life of its programme of work. The first version of this plan was produced on 24 January 2011.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A tool, in the form of an A5 card, given to workshop and toolbox participants, outlining five easy steps to minimise the impact of roadworks on businesses.