Huntsbury Reservoir - Post Earthquake Reconstruction Ozwater 2013 conferen…
Articles, UC QuakeStudies
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
A plan which outlines the principles and methodology for the development of projects. The first version of this plan was produced on 20 September 2011.
A plan which introduces SCIRT, its management structure and its set of management plans. The first version of this plan was produced on 10 August 2011.
A guideline which provided clarity to designers, asset owners and others on the meaning of terminology to describe the type of roading works proposed/undertaken.
A web story about a site visit to the Bridge and Arch by local school pupils.
A document describing Downer's use of column seismic clamps to prevent additional damage to the Arch columns.
A document which describes the process that SCIRT took to restore the Bridge of Remembrance and Memorial Arch.
A document created in 2012 that provides a range of ideas and examples successfully used by SCIRT to manage a site visit information day.
A plan which provides SCIRT with a map for building and sustaining outstanding performance. The first version of this plan was produced on 18 February 2013.
A memorandum which summarises the outcomes of the SCIRT/New Zealand Red Cross introductory session and the design thinking workshop.
An award submission nominating SCIRT for the 2016 New Zealand Spatial Excellence Awards: Category: Award for Technical Excellence.
A story written by Debbie Rawiri, Maori Diabetes Nurse Specialist at the Christchurch Diabetes Centre, about her experiences of the 22 February 2011 earthquake.
A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
A document describing the origins, establishment and operation of a value management regime and framework that gave focus and improved performance of the SCIRT organisation.
A presentation which explains that NZTA have adopted SCIRT's approach to utilities management and sets out the reasons why. This presentation was created in 2015.
A memorandum of understanding that sets out how SCIRT and InfraTrain planned to work together to build an industry training framework and skilled workforce.
A document which outlines how to work safely around underground services, created to discuss with site staff at on-site "toolbox talks".
A document which describes how SCIRT led the co-ordination of its huge repair programme with those of other utilities.
A document which outlines how to work safely in confined spaces, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to safely carry out lifting operations, created to discuss with site staff at on-site "toolbox talks".
A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
An award submission nominating Paula Lock for the Hays NAWIC Excellence Awards 2015: Category: Professional Woman of the Year.
An award submission nominating Jane Taylor for the Hays NAWIC Excellence Awards 2016: Category: Professional Tradeswoman of the Year.
A document that describes a case study on how SCIRT has been designed to create an environment that delivers high performance.
A document which describes how SCIRT's governance structure was set up and developed in response to the many challenges of the horizontal infrastructure rebuild.
A revised memorandum of understanding that sets out how SCIRT and Connexis planned to work together to build an industry training framework and skilled workforce.
A plan which describes how the transition from the IRMO programme to the SCIRT programme will take place after the signing of the Alliance Agreement.
A document containing examples of items and activities SCIRT implemented as part of the programme to support businesses affected and disrupted by SCIRT central city rebuild work.
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Lyttelton area.