Search

found 90231 results

Articles, UC QuakeStudies

This study determined areas of different liquefaction susceptibility in Hurunui District based mainly on geological data, with some limited borehole strata interpretation. Geotechnical data was not analysed. This was the same method used in the earthquake hazard assessments for engineering lifelines in other districts in Canterbury. Hurunui District was the first district that a hazard assessment for engineering lifelines was undertaken for (in 2000) and it did not include a liquefaction susceptibility map like the other district earthquake hazard assessments did. There are no recommendations associated with this report. See Object Overview for background and usage information.

Articles, UC QuakeStudies

Stage IV of the Christchurch liquefaction study updated the Stage II liquefaction hazard and ground damage maps with further data collected from other organisations, and included two additional maps indicating liquefaction sensitivity to groundwater levels. Stage IVa of the Christchurch liquefaction study used revised groundwater levels and adjustments to the liquefaction prediction algorithm. The outputs of the report were liquefaction hazard and ground damage maps for both average summer (low) and average winter (high) groundwater levels. The maps produced as part of Stage IVa of the report were subsequently included in an Environment Canterbury public education poster The Solid Facts on Christchurch Liquefaction which also contained information on how liquefaction occurs and what can be done to mitigate the liquefaction hazard. Stage IV of the Christchurch liquefaction study contained a number of recommendations to improve the liquefaction potential and ground damage maps for Christchurch. See Object Overview for background and usage information.

Articles, UC QuakeStudies

A Gap Filler submission to the Christchurch City Council Draft City Plan on behalf of the Gap Filler Trust, Greening the Rubble Trust and Life in Vacant Spaces Charitable Trust. The submission recommeded that the Christchurch City Council retain the funding levels for these intiatives at 2012 levels ($565,000) rather than reduce them to $400,000 as proposed, and that this funding be tagged for projects citywide and not restructed to the central city.