Beachville Road, Redcliffs - Seawall Repair
Articles, UC QuakeStudies
A pdf copy of a work notice issued by SCIRT giving an overview of the Beachville Road seawall rebuild project.
A pdf copy of a work notice issued by SCIRT giving an overview of the Beachville Road seawall rebuild project.
A web story about the return of the stone lions to the Memorial Arch.
A pdf copy of one of a series of presentations which Red Cross presented to SCIRT, telling them about what the community is undergoing and how Red Cross helps.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
A presentation prepared by SCIRT's Downer Communciation Lead, providing an overview of the community engagement carried out by the Downer Team during the restoration of the Bridge and Arch.
A document describing Downer's use of column seismic clamps to prevent additional damage to the Arch columns.
A tool, including an outline, resources and a survey sheet, used by the SCIRT Communication Team when delivering a series of toolboxes to SCIRT subcontractors about working around businesses.
A paper presented at the New Zealand Concrete Industry Conference 2015 about the design and construction challenges faced when strengthening the Memorial Arch.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
A runsheet created for the initial SCIRT and New Zealand Red Cross collaboration workshop.
A technical guideline which defines SCIRT Delivery Team requirements for as-built field surveying and attribute information.
A document which explains how to use the SCIRT GIS Viewer.
A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.
A tool, including an outline and run sheet, used by the SCIRT Communication Team when delivering a series of workshops to SCIRT engineers about working around businesses.
A paper delivered at Building a Better New Zealand (BBNZ 2014) Conference. The paper examines the relationship between innovation and productivity improvement in the construction industry.
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.
An article from the Media Studies Journal of Aotearoa New Zealand Volume 14, Number 1. The article is titled, "Heroic Radio: a study of radio responses in the immediate aftermath of the September 2010 Earthquake in Christchurch, New Zealand". It was written by Ruth Zanker.
A memorandum which summarises the outcomes of the SCIRT/New Zealand Red Cross introductory session and the design thinking workshop.
A document which sets out the 12d standards at SCIRT.
A document which summarises the outcomes of the SCIRT/New Zealand Red Cross Datasync project collaboration.
A formal guideline to dewatering.
An example of a checklist used by SCIRT traffic management teams to perform site checks.
A flyer which was attached to an email inviting people to the Humaneers action learning group.
An article from the Media Studies Journal of Aotearoa New Zealand Volume 14, Number 1. The article is titled, "Against the Odds: community access radio broadcasting during the Canterbury earthquakes, some reflections on Plains FM 96.9". It was written by Brian Pauling and Nicki Reece.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A runsheet created for the SCIRT and New Zealand Red Cross humaneers action learning group.