Multi Criteria Analysis Asset Prioritisation Tool
Articles, UC QuakeStudies
A document which outlines the processes involved in the Multi Criteria Analysis Asset Prioritisation tool. It also talks about assumptions made and potential gaps.
A document which outlines the processes involved in the Multi Criteria Analysis Asset Prioritisation tool. It also talks about assumptions made and potential gaps.
A document which outlines how SCIRT prioritised the 634 construction projects within its programme of work.
A document which describes SCIRT's framework, principles and process of defining projects and the process of prioritising those projects.
A map showing the actual construction start dates.
An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.
A presentation given at the New Zealand Geospatial Research Conference 2015.
A handout which includes information about the For Real employer process, the pre-employment courses available, a cost and value analysis for employers and some questions and answers.
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
This study evaluated and recommended a methodology for undertaking an earthquake risk assessment for Christchurch, incorporating hazard analysis, inventory collection, damage modelling and loss estimation. See Object Overview for background and usage information.
This study compiled and tabulated all relevant available information on earthquake sources (active faults) in Canterbury and mapped the fault locations onto 1:50,000 or 1:250,000 overlays on topographic maps (later digitised into the Environment Canterbury active faults database). The study also reviewed information on historic earthquakes, instrumental seismicity and paleoseismic studies and identified information gaps. It recommended an approach for a probabilistic seismic hazard analysis and development of earthquake scenarios. See Object Overview for background and usage information.
The Christchurch liquefaction study was initiated to better determine liquefaction susceptibility in Christchurch city. It aimed to improve on earlier liquefaction susceptibility maps, which were based on soil type and distribution, by incorporating soil strength data into liquefaction analysis. This stage of the study included collating available geological and geotechnical data from Environment Canterbury and Christchurch City Council into a database, modelling liquefaction hazard and ground damage and presenting these as maps. The report contains many recommendations, which were taken up in subsequent stages of the study. (Note that the results of Stage 1 of the Christchurch liquefaction study were provided to Environment Canterbury as a letter rather than a report. This was a summary of work completed to 30 June 2001, including a review of geological and geotechnical data available within Environment Canterbury and Christchurch City Council records.) See Object Overview for background and usage information.