A PDF copy of pages 38-39 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Rebuild Central'. Photo: Tim Church. With permission: Christchurch City Council.
A paper published in the Management, Procurement and Law Journal Volume 168 Issue MP3, which describes a different form of alliancing.
An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.
A diagram created in 2011, showing the communication structure across rebuild agencies.
A plan which defines the strategy underlying the SCIRT rebuild programme.
A document which describes SCIRT's approach to creating business systems to aid the rebuild of horizontal infrastructure.
A document which describes the formation of SCIRT.
A PDF copy of pages 26-27 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project '100 Days to Rebuild Democracy'. Photos used with permission: Bronwyn Hayward
An entry from Deb Robertson's blog for 7 May 2013 entitled, "My Thoughts on the Rebuild of Christchurch".
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A pdf copy of a spreadsheet tool used by designers to undertake a whole of life evaluation of rebuild options.
A copy of a letter from Empowered Christchurch to Peter Sparrow, Director of Building Control and Rebuild at the Christchurch City Council, sent on 23 October 2014. The letter is a response to another letter sent by Peter Sparrow to Empowered Christchurch regarding existing use rights and exemptions from a building consent. In this letter, Empowered Christchurch requests furthur clarification from the Christchurch Building Consent Authority about these concepts.
A map showing the actual construction start dates.
A best practice traffic management guideline, produced in February 2014, which helps traffic management team members manage cyclists through road work sites safely.
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Christchurch City area.
A design guideline which provides guidance to designers on how to carry out a whole of life evaluation of rebuild options.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
A report created by BRANZ, the University of Auckland and Constructing Excellence New Zealand which was commissioned by the Productivity Partnership. It examines the use of KPIs by a number of rebuild organisations.
An article that explains the innovative work of SCIRT in a post-disaster environment.
A paper prepared for the Bulletin of the New Zealand Society for Earthquake Engineering, Vol. 44, no. 4, December 2011.
A presentation given at the New Zealand Geospatial Research Conference 2015.
A report which details the archaeological investigations carried out during the course of SCIRT project 11232, wastewater renewal work in Sorensens Place.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A copy of the program for the screenings of Elizabeth Guthrey's film series 'Dancing Through Impermanent Spaces'. The films are a creative response to the earthquakes in Christchurch and were shown as part of the Christchurch Body Festival 2014.
A PDF copy of pages 18-19 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Revival'. Photos: Sam Heap
A guideline which provided clarity to designers, asset owners and others on the meaning of terminology to describe the type of roading works proposed/undertaken.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A report which details the archaeological monitoring carried out during the course of SCIRT project 11136, repairs to the Gloucester Street bridge.
A paper which outlines the observed damage to Christchurch City Council-owned retaining walls and the repair solutions developed.
A report which details the archaeological investigations carried out during the course of SCIRT project 11185, water main renewal work on Manchester Street.