A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.
A PDF copy of pages 274-275 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Central City Plan (Draft Central City Recovery Plan for Ministerial Approval, December 2011)'. Photos with permission: CCC
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A Gap Filler submission to the Christchurch City Council Draft City Plan on behalf of the Gap Filler Trust, Greening the Rubble Trust and Life in Vacant Spaces Charitable Trust. The submission recommeded that the Christchurch City Council retain the funding levels for these intiatives at 2012 levels ($565,000) rather than reduce them to $400,000 as proposed, and that this funding be tagged for projects citywide and not restructed to the central city.
A PDF copy of page 140 of the book Christchurch: The Transitional City Pt IV. The page documents the transitional project 'CCDU 100 Day Plan'.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.