A document that outlines how timely and accurate information relating to estimating, actual project costs, future commitments, and total forecast cost, will be managed and reported for each project phase in the programme.
A final year paper prepared by University of Canterbury students examining the positive effects of SCIRT on the New Zealand construction industry's health and safety performance.
A presentation to the IPWEA conference of a paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
A pdf copy of one of a series of presentations which Red Cross presented to SCIRT, telling them about what the community is undergoing and how Red Cross helps.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
A paper presented at the New Zealand Concrete Industry Conference 2015 about the design and construction challenges faced when strengthening the Memorial Arch.
A paper delivered at Building a Better New Zealand (BBNZ 2014) Conference. The paper examines the relationship between innovation and productivity improvement in the construction industry.
An entry from Deb Robertson's blog for 21 May 2015 entitled, "Nothing is permenant in this world, even our troubles (Charlie Chaplin)".The entry was downloaded on 2 November 2016.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
A presentation prepared by SCIRT's Downer Communciation Lead, providing an overview of the community engagement carried out by the Downer Team during the restoration of the Bridge and Arch.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "KeepOur Assets (KOA)".
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Transition of CERA functions".
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
An entry from Deb Robertson's blog for 24 September 2015 entitled, "Journalists at Work {Part 3(3) COMS 304}".The entry was downloaded on 3 November 2016.
An article from the Media Studies Journal of Aotearoa New Zealand Volume 14, Number 1. The article is titled, "www.useless.com: crisis communications on shaky ground". It was written by Kris Vavasour.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "CCC Long Term Plan Update".
An example of a SCIRT safety alert. Safety alerts were sent out to Delivery Team Health and Safety representatives after an incident who then sent or delivered them to subcontractors.
An entry from Deb Robertson's blog for 30 December 2015 entitled, "I saw it with my own eyes {9/11 Memorial, Statue of Liberty}".The entry was downloaded on 3 November 2016.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Updates for the start of 2015!".
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Christchurch Recovery Plan - have your say".
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "OVTRK Registry Changes - working with CINCH".
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Submissions to Long Term Plan 2015".
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "May 2015 Updates from OVTRK".
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
An entry from Deb Robertson's blog for 1 February 2015 entitled, "The Gift of the Mundane Task".The entry was downloaded on 3 November 2016.
An entry from Deb Robertson's blog for 21 August 2015 entitled, "Sociology of the City {Part 2(4) Sociology 355}".The entry was downloaded on 2 November 2016.